Contract summary
This project will preserve the existing pavement along Northbound and Southbound I-5, MP 69.40 to 80.75 by planing existing asphalt pavement and replacing with hot mix asphalt (HMA). This project will include all through lanes and auxiliary lanes and will also improve the condition of five bridges with bridge joint work as well as removal and replacement of bridge membranes and HMA. Ramps will be excluded. 60 working days. Involves 140 items. Work class 4 - asphalt paving.