Contract summary
Requires planing existing roadway and one bridge deck, removing existing overlay, applying bridge deck repair and installing waterproof membrane to two bridge decks, crack sealing, paving with hot mix asphalt, fog sealing, replacing guardrail and nonstandard terminals, replacing centerline rumble strip and delineation, traffic control and other work. Involves 43 items and 40 working days. Work class 4.