Contract summary
Requires shoulder finishing, pavement repair excavation, crack sealing, planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, erosion control, extruded curb, guardrail, guideposts, pavement markings, rumble strips, permanent signing, traffic control and other work. Involves 51 items and 30 working days. Work class 4 - asphalt paving.