Planning study news
The US 101 Raymond Corridor Management Plan seeks to study how US 101 through Raymond is used today and how it can be improved to help people safely walk, bike, roll and drive in the future.
Purpose
US 101 through Raymond is a five-lane road, with two lanes in each direction and a center lane for left turns. The width of US 101 makes crossing difficult for those walking, biking and rolling. The roadway has more lanes than needed for current traffic volumes and for what is expected in the future. Roads that are too wide can encourage speeding, creating unsafe conditions. Although there are sidewalks on both sides, they are too narrow for the posted speed limits. With narrow sidewalks and fast-moving traffic, it is unsafe for pedestrians and cyclists.
As a part of this study, WSDOT recommends possible changes to the roadway, including removing one travel lane in each direction and adding bike lanes, as a part of a future paving project or other roadway work planned within the project area.
Upcoming Events:
US 101 Raymond Corridor Plan
Paving and Pre-Design
Come to our Open House!
June 11 from 5–7 p.m. at Raymond City Hall
- Learn more about the Corridor Plan.
- Tell us about how you use US 101.
- Enjoy light refreshments!
Visit our online open house between June 11–August 2 to share feedback and ask questions.
Plan del tramo de la US 101 que pasa por Raymond
Pavimentación y diseño previo
Asista a nuestra jornada de puertas abiertas.
El 11 de junio de 5 a 7 p. m. en el ayuntamiento de Raymond
- Obtenga más información sobre el Plan del tramo.
- Cuéntenos cómo usa la US 101.
- Disfrute de comidas ligeras.
Visite nuestra jornada de puertas abiertas en línea del 11 de junio al 2 de agosto para compartir sus comentarios y hacer preguntas.