Contract summary
Removing sidewalk, curb, gutter, pavement markings, and roadway excavation, installing crushed surfacing base course (CSBC), hot mix asphalt(HMA), curb and gutter, sidewalk, pavement markings, conduit, rail joints, replacing rail and crossings, ballast distribution, surface line and dress, surveying, erosion control, traffic control and other work, Contains 43 bid items and 25 working days. Class 54.
- Award status: all bids rejected 1/10/2024
- Bid tabulation (PDF 64KB)
Project information available
You can find plans and specifications, plan holder lists, addenda, reference information, questions and answers and other contract documents in the 2023 CW Branch SR 904 Betz Rd Crossing - PCC contracts document archive.