Contract summary
Removing the existing 36” corrugated metal culvert and replacing with an eighteen-foot clear span eight-foot rise precast concrete four-sided box culvert with wing and end walls, regrading of Andy Creek and placement of streambed materials, raising the roadway profile and widening of the roadway shoulders, replacing a 30” corrugated metal culvert, placing crushed surfacing and hot mix asphalt, regrading of roadside ditches, utilities coordination, delineation; guardrail, traffic detour maintenance; roadside planting and erosion control, traffic control and other work. Involves 11 items and 45 working days.
- Award status: awarded 10/6/2023
- Award amount: $1,432,649.00
- Awarded to: Barcott Construction, LLC
PO Box 366
Chehalis, WA 98532-0366 - Bid tabulation (PDF 144KB)
Project information available
You can find plans and specifications, plan holder lists, addenda, reference information, questions and answers and other contract documents in the White Pass Vicinity - Major Drainage Phase 3B archive.