Contract summary
The Washington State Department of Transportation (WSDOT) plans to replace 29 existing fish barriers within Kitsap County with fish passable structures utilizing a progressive design-build delivery method. This project will replace 29 existing fish barrier crossings on SR 3, SR 104, SR 303, SR3 07 and SR 308 in Kitsap County with fish passable structures (buried structures and bridges) in compliance with the federal injunction regarding fish passage underneath WSDOT highways. This project will be delivered in two phases using the progressive design-build delivery method, Phase 1 will include preliminary engineering and phase 2 will include final design and construction. The project shall include, but is not limited to the following:
Determination of the delivery approach for the 29 fish barriers in guaranteed maximum price (GMP) bundles.
Providing documentation in support of the environmental review process in which WSDOT is the lead.
Provide scoping documents in support of the project.
Coordination with WSDOT, the Washington State Department of Fish and Wildlife, and 6 different tribes in determining the best fish passable solution.
Acquiring all necessary environmental permits as an authorized agent of WSDOT.
Acquiring all necessary property rights as an authorized agent of WSDOT.
Providing mitigation solutions for sensitive area impacts.
Facilitating temporary and permanent utility adjustment and relocation.
Other project elements include, but are not limited to, surveying, construction staging and maintenance of traffic, constructing embankment, grading, retaining walls, stream realignment and restoration, temporary stream bypass, fish exclusion, culvert removal or abandonment, paving, stormwater drainage, signing, erosion and sediment control, and planting.
- Award status: awarded 9/21/2023
- Award amount: $37,451,300.00
- Awarded to: Kiewit Infrastructure West Co.
2200 Columbia House Blvd
Vancouver, WA 98661-7753
Executed Contract
- Executed contract (PDF 8MB) - posted 12/8/2023
- Reliance documents (FTP Directory) - posted 2/5/2024
- Attachments (FTP Directory) - posted 2/5/2024
- Reference documents (FTP Directory) - posted 12/8/2023
Announcement of selected proposer
- Highest scoring proposer determination (68KB) - posted 7/28/2023
- Bid tabulation (PDF 49KB) - posted 9/21/2023
Request for proposal Q&A
- Q&A 1 (PDF 110KB) - posted 5/5/2023
- Q&A 2 (PDF 161KB) - posted 5/19/2023
Request for proposal addenda
- Addendum #1 (FTP Directory) - posted 4/28/2023
- Addendum #2 (FTP Directory) - posted 5/11/2023
- Addendum #3 (FTP Directory) - posted 5/23/2023
Request for proposal
- WSDOT PDF contract (RFP issuance draft) (PDF 4.896MB) - posted 5/1/2023
- WSDOT PDB contract redline (RFP issuance draft) (PDF 5MB) - posted 4/10/2023
- Request for proposal (PDF 576KB) - posted 4/10/2023
- Reliance documents (FTP Directory) - posted 4/10/2023
- Proposal forms (FTP Directory) - posted 4/10/2023
- Attachments (FTP Directory) - posted 4/10/2023
- Reference documents (FTP Directory) - posted 4/10/2023
Short listed submitters
Short list letter (PDF 206KB) - posted 4/3/2023
Voluntary submitters meeting materials
- Submitters list (PDF 100KB) - posted 3/9/2023
- Voluntary submitters meeting presentation (PDF 3MB) - posted 2/2/2023
- Meeting sign in sheet (PDF 63KB) - posted 2/2/2023
- Submitters meeting flyer (PDF 518KB) - posted 1/27/2023
Request for qualifications Q&A
Q&A 1 (PDF 76KB) - posted 2/9/2023
Request for qualifications
- Request for qualifications (PDF 1.1MB) - posted 1/23/2023
- Fillable forms (FTP Directory) - posted 1/23/2023
- Attachments (FTP Directory) - posted 1/23/2023
- Reference documents (FTP Directory) - posted 1/23/2023
- Reliance documents (FTP Directory) - posted 1/23/2023
- Schedule C (FTP Directory) - posted 1/23/2023
Request for qualifications addenda
- RFQ Addendum #1 (PDF 92KB) - posted 1/31/2023
Project Information Available
- Pre-advertisement notice (PDF 1.1MB) - updated 1/9/2023
- Notice regarding restrictions on teaming (PDF 112KB) - posted 9/14/2022