• Study

SR 3 and Division Avenue Roundabout Pre-design Study

Planning study news

Thank you for participating in the SR 3 Division Avenue Roundabout Pre-Design. The pre-design is complete

Timeline
January 2025 - October 2025
Status
Complete
Budget
$180,000

Purpose

This pre-design sought feedback on a roundabout at the SR 3 and Division Avenue and West Pleasant Street intersection.

In June and July 2025, WSDOT met with local agencies. In August 2025, WSDOT conducted an online open house. The goal of these meetings was to make sure the project meets the community’s needs and to get feedback on the proposed roundabout and street improvements.

The community engagement report (PDF 1.29MB) with information about the pre-design, the recommended roundabout and feedback WSDOT received during the online open house is available. 

A roundabout is planned at the intersection of State Route 3 and Division Avenue/West Pleasant Avenue in Kitsap County.

Target Zero is the Washington State Department of Transportation’s safety improvement program. It aims to reduce serious and fatal crashes on state highways. The program focuses on two aspects: crash reduction and crash prevention.

Studies show that roundabouts are safer than traditional traffic signals or stop signs. They accommodate vehicles of various sizes. This includes emergency vehicles, buses, bicycles, semi-trucks with trailers, and farm and logging equipment.

WSDOT routinely reviews rural area intersections on state highways.  We look for locations that are at the highest risk for severe crashes.  Once we identify those intersections, WSDOT develops a plan to reduce crash potential.