Project
US 395 – Hafer Road to Chewelah – Paving & Complete Streets
Timeline: July 2025 - October 2025
This project will rehabilitate roughly five miles of US 395 between Hafer Road and Sand Canyon Road just north of Chewelah, Stevens County. This project includes removing the current roadway surface which has reached the end of its usable life and repaving it with Hot Mix Asphalt (HMA).
…
…
Project
US 395 – Hatch Road to Hamilton Road – Paving
Timeline: September 2024 - June 2025
This project will rehabilitate roughly nine lane miles of US 395 from Hatch Road to Hamilton Road in Spokane County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and…
Project
US 395 – Loon Lake to Hafer Road – Paving & Roundabout - Complete June 2023
Timeline: August 2022 - June 2023
This project will grind and inlay a little more than 12 miles of roadway on US 395 in Stevens County between the intersection with SR 292 in Loon Lake north to Hafer Road. Crews will be grinding out the pavement and replacing the roadway surface with Hot Mix Asphalt (HMA) to create a smoother ride…
Project
US 395 – NSC I-90 Connection
Timeline: June 2027 - Early 2030's
This is the final four projects to construct the North Spokane Corridor and connect to I-90. This is the last step to create the limited access 10.5 mile freeway north/south through Spokane that will remove freight and trips off of the local system.
Project
US 395 – NSC Spokane River Crossing
Timeline: May 2023 - 2025
This project will construct the North Spokane Corridor bridge that will cross the Spokane River and connect the skyway portion near Spokane Community College to the south and at Carslie Avenue to the north of the river.
Project
US 395 – NSC Sprague Ave to Spokane River – Stage 2
Timeline: Late 2025 - December 2028
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 2 project will construct a new divided, four-lane elevated highway from Alki Avenue to Mission Avenue with a partial interchange at Trent Avenue/SR 290. The partial interchange includes an off-ramp and an on-ramp that utilize…
Project
US 395 – NSC Sprague Ave to Spokane River – Stage 3
Timeline: August 2025 - December 2027
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 3 project will construct a new divided, four-lane highway from Sprague Avenue to Alki Avenue. It is the final southern section of the NSC before the connection to Interstate 90.
Project
US 97 - Centerville Rd. to Ski Lodge Rd. Vic. - Paving - Complete September 2022
Timeline: Summer 2021 - Summer 2022
This project repaired the roadway by sealing cracks, smoothing ruts and filling potholes and created a smoother, safer driving surface for all users of the highway. Crews also paved sections along East Simcoe Drive.
Project
US 97 - Satus Creek Bridge - Bridge Replacement - Completed in October 2022
Timeline: Spring 2020 - Oct. 2022
This project replaced the aging and failing US 97 Satus Creek Bridge with a new concrete bridge structure that meets current standards, improving safety and mobility for all travelers.
Project
US 97 - Toppenish to Union Gap - Corridor Improvements
Timeline: 2021 - To be determined
Since 2018, the Yakama Nation Tribal Council has signed resolutions supporting WSDOT’s proposals to add seven roundabouts at US 97 and SR 22 intersections. Roundabouts at US 97/ McDonald/Becker Road and at US 97/Jones Road are complete. Roundabouts at US 97/ SR 22, SR 22/ SR 223, and US 97/ Larue…
Project
US 97A & SR 971 Rock Slope - Scaling - Complete May 2022
Timeline: March 2022-May 2022
This project will stabilize 6 slopes with rock slope scaling to remove rockfall debris adjacent to the roadway. Work will also repair and install wild life fencing and pavement.
Slopes are located on US 97A at milepost 211.26 - 211.42 and on SR 971 between milepost 10.27 and 11.49.…
Slopes are located on US 97A at milepost 211.26 - 211.42 and on SR 971 between milepost 10.27 and 11.49.…
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.