Search projects

Learn about current transportation network improvement and preservation activities throughout the state.

You might be looking for studies or local agency managed projects

Filter projects

      Select Project status
      Select Mode
      Select Funding source
      Select Special collection

      367 results

      Project

      2022 Eastern Region Chip Seal - South - Complete October 2022

      Timeline: May 2022 - September 2022
      • Road
      • Completed
      • Whitman County
      This project will preserve multiple state routes across Whitman County in Eastern Washington.

      Included in the chip seal project will be constructing bituminous surface treatment (BST), planning bituminous pavement, crack sealing, hot mix asphalt (HMA) paving, pavement repair, and…
      Project

      2023 Eastern Region Chip Seal - North - Complete October 2023

      Timeline: April 2023 - October 2023
      • Road
      • Completed
      • Adams County
      • Lincoln County
      • Stevens County
      • Pend Oreille County
      This project preserved multiple state routes across Pend Oreille, Stevens, Lincoln and Adams counties in Eastern Washington.

      Chip sealing is the application of a special protective wearing surface to an existing pavement. Included in the chip seal project will be constructing…
      Project

      2023-24 Northwest Regional Pavement Repairs and Breakaway Cable Terminal

      Timeline: Fall 2023 - Summer 2024
      • Road
      • Construction
      • King County
      • Snohomish County
      • Whatcom County
      A regional project beginning in March 2024 updated 24 guardrails and attenuators along Interstates 5, 90 and 405, US 2 and State Routes 522 and 527 in King, Snohomish and Whatcom counties. The breakaway cable terminals, or guardrail protective end caps, face oncoming traffic. This project also…
      Project

      2024 Eastern Region Chip Seal - Complete August 2024

      Timeline: May 2024 – August 2024
      • Road
      • Completed
      • Pend Oreille County
      • Spokane County
      • Lincoln County
      • Whitman County
      This project preserves multiple state routes across Spokane, Lincoln, Whitman, and Pend Orielle Counties in Eastern Washington.

      Chip sealing is the application of a special protective wearing surface to an existing pavement. Included in the chip seal project will be constructing…
      Project

      2024 OR Regionwide Chip Seal - Complete November 2024

      Timeline: June 2024 - November 2024
      • Road
      • Completed
      • Pierce County
      • Jefferson County
      • Grays Harbor County
      • Clallam County
      This project extended the life of the roadway and reduced the frequency of emergency repairs on sections of four state highways in Clallam, Grays Harbor, Jefferson and Pierce counties.

      Chip sealing is a process where crews apply a protective surface to existing pavement.
      Project

      2025 Eastern Region Chip Seal

      Timeline: July 2025 - August 2025
      • Road
      • Not started
      • Adams County
      • Franklin County
      This project preserves two state routes in Franklin and Adams Counties in Eastern Washington.

      SR 21 – SR 260 to US 395 (23.92 miles)
      SR 260 – Kahlotus to Washtucna (13.18 miles)
      Project

      21-23 SWR Regionwide Bridges Concrete Deck Patching - Complete June 2023

      Timeline: Summer 2022 - Summer 2023
      • Road
      • Completed
      • Benton County
      • Cowlitz County
      • Lewis County
      • Pacific County
      • Klickitat County
      Between summer 2022 and 2023, WSDOT's contractor, Granite Construction Company, began work on a pilot program to rehabilitate the concrete decks of several bridges throughout southwest Washington. Crews removed all non-cement patches and replaced them with cement material, extending the useful…
      Major Project

      Alaskan Way Viaduct Replacement Program

      Timeline: 2007 - 2023
      The Alaskan Way Viaduct Replacement Program consists of 30 projects led by the Washington State Department of Transportation, King County, the City of Seattle and the Port of Seattle. The Federal Highway Administration is a partner in this effort.
      Project

      Anacortes Terminal Tollbooth Replacement Project

      Timeline: May 2023 - Winter 2024
      • Ferry
      • Completed
      • Skagit County
      • San Juan County
      The Anacortes Ferry Terminal has provided a gateway to the San Juan Islands and Sidney B.C. for more than 50 years with only minor changes made to the terminal. Washington State Ferries (WSF) plans on updating all four Anacortes Ferry Terminal tollbooths to better serve the ferry customers who use…
      Project

      Bainbridge Ferry Terminal Overhead Loading Fixed Walkway Replacement

      Timeline: 2018 - Early 2024
      • Ferry
      • Completed
      • Kitsap County
      The ferry route between Seattle and Bainbridge Island is the busiest in the system for walk-on passengers. This project replaces the existing overhead wooden walkway with a wider, safer concrete and steel structure built to current seismic code.
      Project

      Battery Street Tunnel and North Surface Streets - Complete July 2021

      Timeline: February 2019 - July 2021
      • Road
      • Completed
      • King County
      After SR 99 in Seattle was aligned to run through the SR 99 tunnel, the Battery Street Tunnel was decommissioned and filled and the tunnel's northern approach built into a new arterial street (Seventh Avenue North) featuring bus lanes and reconnected intersections.
      Project

      CW Branch – SR 904 Betz Road Crossing – PCC - Completed August 2024

      Timeline: July 2024 - September 2024
      • Road
      • Completed
      • Spokane County
      This project will repave the railroad crossing utilized by the Washington Eastern Railroad at the intersection of State Route 904 and Betz Road in Cheney.
      Project

      East Jefferson County Remove Fish Barriers - Completed November 2023

      Timeline: May 2023 - November 2023
      • Road
      • Completed
      • Jefferson County
      This project removed fish barriers at two locations: one on State Route 104 at Shine Creek, and the other on State Route 19 at Swansonville Creek.

      At both locations, 18-foot three-sided culverts were constructed.
      Project

      East of Vantage to Moses Lake project

      Timeline: July 2025 - 2026
      • Road
      • Not started
      • Grant County
      This project will consist of planing and paving both eastbound and westbound driving lanes on Interstate 90 from milepost 138.26 to milepost 148.44, (eastbound) and from milepost 138.55 to milepost 148.44 (westbound). Also, it will pave all eastbound and westbound lanes from MP 175.62 to milepost…
      Project

      Eastern Region – Bridge Deck Preventative Preservation – Patching - Complete August 2022

      Timeline: May 2022 - August 2022
      • Road
      • Completed
      • Adams County
      • Lincoln County
      • Stevens County
      • Whitman County
      • Franklin County
      This project will conduct spot repairs on concrete bridge decks by patching potholes and replacing fatigued sections of concrete on seven bridges within Adams, Franklin, Lincoln, Stevens, and Whitman Counties. Once the project is complete, the service life of the bridges will be extended on rural…
      Project

      Ferries - Mukilteo Multimodal Terminal Project - Complete December 2020

      Timeline: Spring 2015 - December 2020
      • Ferry
      • Completed
      • Snohomish County
      The Mukilteo/Clinton ferry route is part of State Route 525, the major transportation corridor connecting Whidbey Island to the Seattle-Everett metropolitan area. It is one of the state's busiest routes, with more than 4 million total riders every year. By 2040, walk-on ridership during the…
      Project

      Ferries - Seattle Multimodal Terminal at Colman Dock Project

      Timeline: Summer 2017-2024
      • Ferry
      • Construction
      • King County
      Washington State Ferries is replacing the aging and seismically vulnerable Colman Dock in Seattle to maintain its critical role as a regional multimodal transportation hub.

      Key project elements include: a concrete and steel trestle, main terminal building, entry building (with retail…
      Major Project

      Ferry system electrification

      Timeline: 2020-2040
      Washington State Ferries (WSF) will rebuild and modernize our fleet and convert our system, the largest in the country, to hybrid-electric power by 2040 following direction from the Washington legislature and governor. Rebuilding the fleet is necessary to ensure reliable ferry service.…
      Project

      I-405 - BN RR Br to Ped Trail Br & I-90/E Fork Issaquah Creek - Seismic

      Timeline: Summer 2022- Spring 2024
      • Road
      • Construction
      • King County
      In winter 2023, our contractor began a project on the I-405 corridor, in Tukwila and Bellevue, to strengthen several overpasses so they can better withstand a major earthquake. They will place steel "jackets" around columns that support overpasses to help keep the concrete together in an…
      Project

      I-405/Brickyard to SR 527 Improvement Project

      Timeline: The project is expected to complete construction in 2028 in alignment with Sound Transit Bus Rapid Transit.
      • Road
      • Construction
      • King County
      The I-405/Brickyard to SR 527 Improvement Project enhances four and a half miles of the corridor, primarily in Bothell, from just south of the State Route 522 interchange and ending at the SR 527 interchange. WSDOT, Sound Transit and design-build contractor Skanska USA Inc., will deliver…
      Project

      I-405/Lind Ave SW Bridge – Span replacement - Complete May 2024

      Timeline: Completed
      • Road
      • Completed
      • King County
      In fall 2023, contractor crews started construction to replace the damaged northern span of the Lind Avenue Southwest bridge over southbound Interstate 405 in Renton. The Lind Avenue overpass is now back open.
      Project

      I-405/Northeast 132nd Street Interchange Project

      Timeline: Spring 2022 - Spring 2024
      • Road
      • Completed
      • King County
      WSDOT and design-build contractor Graham Contracting, Ltd. constructed a new on-ramp to northbound I-405 and a new off-ramp from southbound I-405 at Northeast 132nd Street in Kirkland. This type of interchange is known as a half-diamond. Travelers now have the option to access I-405 at Northeast…
      Project

      I-405/Northeast 85th Street Interchange and Inline BRT Station Project

      Timeline: December 2022 - January 2027
      • Road
      • Construction
      • King County
      WSDOT, Sound Transit, and design-build contractor Graham Contracting, Ltd. are working to reconstruct and improve the I-405/Northeast 85th Street interchange. This project design supports Sound Transit's Stride Bus Rapid Transit (BRT), improves transit connections on Northeast 85th Street, and…
      Project

      I-405/Renton to Bellevue Widening and Express Toll Lanes Project

      Timeline: 2015 - 2025
      • Road
      • Construction
      • King County
      Travelers on Interstate 405 between Renton and Bellevue experience one of the state’s worst commutes. The I-405/Renton to Bellevue Widening and Express Toll Lanes project includes multimodal transportation and safety improvements to offer more reliable travel choices and keep drivers, transit…
      Project

      I-405/Ripley Lane Stream Connection Project

      Timeline: The project is currently in the design and environmental stages. We anticipate construction will be complete by 2025.
      • Road
      • Pre-construction
      • King County
      The Ripley Lane Stream Connection Project is part of a series of fish barrier corrections planned by WSDOT for the I-405/SR 167 corridor. The Ripley Lane Stream Connection Project will construct new stream channels by combining two culverts into one open channel. We determined that the proposed…
      Major Project

      I-405/SR 167 Corridor Program

      Timeline: We delivered the first project in 2005, 15 additional projects by 2015 and continue towards construction readiness on funded projects.
      The I-405/SR 167 Corridor Program stems from the I-405 Master Plan and SR 167 Master Plan, foundational documents that guide project development, funding and delivery. The I-405 Master Plan alone includes over 150 projects designed to improve travel between Lynnwood and the Renton/Tukwila area.…
      Project

      I-5 - 179th St. Interchange - Interchange Improvements

      Timeline: 2024 - 2031
      • Road
      • Not started
      • Clark County
      This project aims to improve mobility for travelers who use the I-5 - Northeast 179th Street interchange. Signalized intersections will be removed and replaced with roundabouts at the on- and off-ramps to and from I-5. Roundabouts help to relieve congestion by keeping people moving safely through…
      Project

      I-5 - Gravelly-Thorne Connector

      Timeline: 2025-2026
      • Road
      • Pre-construction
      • Pierce County
      This project will create new non-motorized access for people between the Tillicum and Woodbrook neighborhoods.
      Project

      I-5 - M Street to Portland Avenue - HOV - Complete November 2018

      Timeline: 2014 - 2018
      • Road
      • Completed
      • Pierce County
      This project widened northbound and southbound I-5 so that each direction has four general-purpose lanes each and one HOV lane from M Street to Portland Avenue in Tacoma

      To widen both directions of I-5, WSDOT rebuilt the Pacific Avenue and East McKinley Way bridges over I-5 and…
      Project

      I-5 - Mounts Rd. to Center Dr. - Auxiliary Lane Extension - Complete September 2018

      Timeline: 2016-2018
      • Road
      • Completed
      • Pierce County
      WSDOT extended the auxiliary lane south approximately 1.5 miles, so that it starts at the Mounts Road overpass. Trucks approaching the weigh station along with entering and exiting traffic use this lane while the majority of traffic uses the adjacent three through lanes.

      To…

      Slow down on ice and snow.

      It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.

      Carry chains, practice installing them.

      Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.

      Pack your winter car kit.

      Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.