Search projects
Learn about current transportation network improvement and preservation activities throughout the state.
You might be looking for studies or local agency managed projects
367 results
Project
SR 520 Floating Bridge and Landings Project - Complete Summer 2017
Timeline: Bridge construction began in spring 2012 and was completed in summer 2017.
We replaced the world's longest floating bridge – a four-lane, 1960s-era structure – with a safer, six-lane bridge designed to withstand stronger windstorms and waves. Opened in April 2016, the new bridge also added shoulders for disabled vehicles and a separated, 14-foot-wide path for…
Project
SR 520 I-5 Express Lanes Connection Project
Timeline: August 2021 - April 2025
The SR 520/I-5 Express Lanes Connection Project will create a dedicated reversible transit and carpool connection between SR 520 and the I-5 Express Lanes, along with a reversible transit/carpool ramp at the I-5/Mercer Street interchange.
Project
SR 520 Montlake Project
Timeline: Summer 2019 - 2024
The Montlake Project will improve transportation for both motorized and nonmotorized travel along the corridor with a new SR 520 eastbound bridge over Union Bay. This project also builds a new, three-acre lid covering the highway in Montlake that will include regional transit stops and open green…
Project
SR 520 Pontoon Construction Project - Complete Spring 2015
Timeline: Construction of the casting basin and pontoons began in Aberdeen in 2011. Pontoon construction ended in spring 2015.
The SR 520 floating bridge is supported and stabilized by 77 concrete pontoons . The Pontoon Construction Project built a casting basin and 33 of the bridge’s pontoons in Aberdeen, Washington. We built 44 of the bridge’s smaller pontoons in Tacoma, Washington, as part of the Floating Bridge and…
Project
SR 520 Portage Bay Bridge and Roanoke Lid Project
Timeline: 2024-2031
The Portage Bay Bridge and Roanoke Lid Project will replace the aging Portage Bay Bridge with a seismically resilient structure that includes improved bus/carpool travel and an extension of the SR 520 Trail. This project also builds a landscaped lid between Seattle’s Roanoke Park and North Capitol…
Project
SR 520 West Approach Bridge North Project - Complete December 2017
Timeline: Construction began in September 2014 and finished in December 2017.
The West Approach Bridge North Project extended SR 520’s three westbound lanes, including a transit/HOV lane, from the new floating bridge to Seattle’s Montlake neighborhood. It also expanded the new SR 520 Trail across Lake Washington to Seattle.
Project
SR 520/124th Avenue NE Interchange Improvements Project
Timeline: This project is currently in the preliminary engineering stage.
Currently, over half the trips from westbound SR 520 are traveling to the Bellevue vicinity. A new project will allow westbound drivers the option to access the downtown Bellevue vicinity by exiting SR 520 onto 124th Avenue Northeast before reaching the heavily congested I-405/SR 520 interchange.…
Project
SR 522 - I-5 to 61st Ave NE - Paving & ADA Compliance
Timeline: Spring 2020 to Fall 2022
WSDOT contractor crews will repave sections of SR 522, commonly known as Lake City Way or Northeast Bothell Way, which were last paved in 2002.
Project
SR 522 - Paradise Lake Rd to Snohomish River Br - Interchange & Widening
Timeline: 2017 - 2027
SR 522 in Snohomish County is an increasingly important east-west route connecting communities between Woodinville and Monroe. One section between Paradise Lake Road in Maltby and the Snohomish River remains one-lane in each direction. We plan to widen the highway to two lanes in each direction,…
Project
SR 522/Cat Whisker Creek Fish Passage
Timeline: Spring 2026 - Summer 2027
This project will remove a fish passage barrier along Cat Whisker Creek at State Route 522, just east of 61st Avenue Northeast in Kenmore. Contractor crews working for WSDOT will remove an existing 6-foot by 3-foot box culvert and replace it with a fish-passable structure. This new structure has…
Project
SR 522/Thornton Creek Fish Passage
Timeline: Winter 2021-Spring 2028
Reconnecting waterways where roads act as barriers is a priority for the state. In western Washington, this means building hundreds of fish-passable structures under state highways to create habitat that is essential for meeting fish recovery goals.
A culvert below State Route 522…
A culvert below State Route 522…
Project
SR 524/Martha Creek to Swamp Creek Fish Passage
Timeline: Summer 2027 - Winter 2030
This project will remove a barrier to fish passage along Martha Creek on State Route 524 near Lynnwood. Contractor crews working for WSDOT will remove the existing culvert and replace it with a fish-passable structure. This new structure has the potential to open more than 1.5 miles of habitat for…
Project
SR 524/Scriber Creek Fish Passage
Timeline: Winter 2021 - Spring 2028
Reconnecting waterways where roads act as barriers is a priority for the state. In western Washington, this means building hundreds of fish passage structures under state highways to create habitat that is essential for meeting fish recovery goals.
A culvert under State Route 524…
A culvert under State Route 524…
Project
SR 525 Mukilteo Bridge Over Railroad – Bridge Replacement
Timeline: 2024 - 2028
This project will replace the State Route 525 bridge overcrossing the BNSF railroad in the city of Mukilteo. The new bridge will include active transportation improvements to improve safety for all travelers and increase connectivity between Old Town Mukilteo and the waterfront, including the new…
Project
SR 525 Pedestrian and Traffic Improvements - Complete March 2024
Timeline: October 2023 - March 2024
In fall 2023, we added 4 feet of width to a sidewalk along northbound State Route 525/Mukilteo Speedway in Mukilteo to make it 7.5 feet wide on a bridge over the BNSF railroad tracks. We also added new ADA-compliant curb ramps and upgraded the railing between Second and First streets.
Project
SR 525 Spur Vic to Mukilteo Ferry Terminal – HMA Paving and ADA Compliance
Timeline: 2026-2024
This project will repave, with Hot Mix Asphalt (HMA), and construct Americans with Disability Act (ADA) upgrades on State Route 525 from the SR 525 Spur Vic to Mukilteo Ferry Terminal. This project is subject to WSDOT’s Complete Streets requirements. Additionally, the paving project was awarded a $…
Project
SR 525 — Clinton Ferry Terminal Vicinity — Pedestrian Connectivity - Completed June 2023
Timeline: Spring 2023 - Fall 2023
This connectivity project improved the pedestrian access route on State Route 525 in Clinton from the Park & Ride at Deer Lake Road (milepost 8.9) to the Washington State Ferries — Clinton Ferry Terminal (milepost 8.5).
Project improvements included the sidewalk, crosswalks,…
Project improvements included the sidewalk, crosswalks,…
Project
SR 525/Box Springs, Maple Creek and Unnamed Tributary to Swamp Creek Fish Passage
Timeline: Summer 2027 - Winter 2030
This project will remove three barriers to fish passage along Box Springs Creek, Maple Creek and Unnamed Tributary to Swamp Creek under State Route 525 near Lynnwood. Contractor crews working for WSDOT will remove existing culverts and replace them with fish-passable structures. These new…
Project
SR 525/I-405 Interchange to SR 99 Vicinity - Paving & ADA
Timeline: Summer 2025 - Fall 2025
Crews working for WSDOT will pave roughly two miles in both directions of State Route 525 from the Interstate 405 interchange to just south of 148th Street Southwest, as well as, eight ramps. The two bridges over Alderwood Mall Parkway and Maple Road will not be paved. Once contractor crews finish…
Project
SR 526 - Airport Road to Casino Road Seismic Retrofit - Complete December 2023
Timeline: February 2023 to December 2023
Our contractor crews strengthened four bridges along State Route 526 in Everett so they can better withstand a major earthquake. They wraped steel “jackets” around the columns that support the bridges to hold the concrete together in an earthquake, reducing the chance of collapse. They also added…
Project
SR 526/Evergreen Way Vic to I-5 Vic - Corridor Improvements
Timeline: 2017 - 2025
Portions of the State Route 526 corridor will be improved with construction of an eastbound lane between Hardeson Road/5th Ave NW and I-5, improved signal operations at the SR 526/527 intersection and new ramp meters from eastbound SR 526 to northbound I-5. Work includes roadway widening in…
Project
SR 527 - Penny Creek - Fish Passage
Timeline: 2024 - Early 2027
As part of WSDOT’s fish passage program, we will build a 26-foot fish-passable structure under SR 527 just south of 164th Street Southeast in Mill Creek. The current 9-foot culvert causes water to flow too fast for fish to continue upstream. The new bridge span will open more than 8 miles of…
Project
SR 528/Munson Creek to Allen Creek Fish Passage
Timeline: Spring 2022 - Fall 2027
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where our roads act as barriers. In western Washington, that means building hundreds of fish passable structures under state highways in the next decade to create habitat gain essential for…
Project
SR 529/SB Steamboat Slough Bridge - Bridge Painting
Timeline: Spring 2025-Spring 2026
Contractor crews working for WSDOT will paint the southbound SR 529 Steamboat Slough Bridge between Marysville and Everett, which has deteriorated due to weathering. This project will replace the paint to preserve the existing structural integrity and extend the service life of the bridge.
Project
SR 529/Snohomish River & Steamboat Slough - Bridge Repair, Rehab & Paint
Timeline: Summer 2023 – Spring 2025
Corrosion from weather is damaging the Snohomish River Bridge and Steamboat Slough Bridge. Beginning in 2023, crews working for WSDOT have been rehabilitating the northbound SR 529 Snohomish River Bridge between Everett and Marysville by repairing or replacing steel truss elements, substructure…
Project
SR 530 - 59th Ave NE and 211th Place NE intersection improvements - Complete August 2023
Timeline: Summer 2021 - Fall 2023
WSDOT built two compact roundabouts on SR 530 at the intersections of 59th Avenue Northeast and 211th Place Northeast, just west of Arlington. These compact roundabouts reduce the risk of serious collisions at these intersections as drivers will no longer have to make turns across lanes of fast-…
Project
SR 530 Montague Creek Bridge to Seeman Street Vic Paving - Completed September 2023
Timeline: June 2023 - September 2023
This project, located in Snohomish County included paving along State Route 530 between milepost 35 to 36, 38 to 40, 42 to 48 as well as on several bridges along the corridor.
The asphalt on this stretch of SR 530 has outlived its anticipated lifespan. Through the years, cracks, ruts…
The asphalt on this stretch of SR 530 has outlived its anticipated lifespan. Through the years, cracks, ruts…
Project
SR 531 - 43rd Ave NE to 67th Ave NE - Widening
Timeline: July 2019 - Winter 2026
This section of SR 531 between 43rd Avenue Northeast and 67th Avenue Northeast in Arlington will be widened to add a second lane in each direction. In addition, roundabouts will be added at three intersections to improve safety, travel times and reduce congestion.
Project
SR 534 Unnamed Tributary to Carpenter Creek Fish Passage - Completed November 2023
Timeline: June 2023 - October 2023
WSDOT removed the existing 35-foot long, 36 inch in diameter concrete pipe at the State Route 534 Unnamed Tributary to Carpenter Creek fish passage site located at milepost .5 in Conway and replaced it with a fish passable structure.
Project
SR 536/Skagit River Bridge - Painting
Timeline: December 2022 – Winter 2026
The State Route 536 Skagit River Bridge received its last coat of paint in 1990. After 34 years, contractor crews will finally add fresh paint the bridge to preserve and extend its service life. In addition to painting, this project includes all the preparation work before painting, such as…
Slow down on ice and snow.
It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.
Carry chains, practice installing them.
Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.
Pack your winter car kit.
Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.