Search projects
Learn about current transportation network improvement and preservation activities throughout the state.
You might be looking for studies or local agency managed projects
371 results
Project
SR 20/Burlington to Sedro-Woolley - Corridor Improvements
Timeline: Fall 2025 to Fall of 2026
WSDOT is currently working on design plans to address safety concerns along the State Route 20 corridor between Sedro-Woolley and Burlington. The intent of this project is to improve safety along this busy stretch of highway with the construction of intersection roundabouts, pedestrian crossings,…
Project
SR 20/Kearney St I/S – Roundabout – Completed June 2024
Timeline: September 2023 - June 2024
This project took the existing intersection on State Route 20 at Kearney Street in Port Townsend and converted it into a single-lane roundabout.
Project
SR 20/Olson Creek and Unnamed Tributary to Skagit River - Fish Passage - Completed Spring 2025
Timeline: March 2023 - May 2025
Contractor crews working on behalf of WSDOT replaced the culvert crossings under State Route 20 at an unnamed tributary to Skagit River (milepost 94) and Olson Creek (milepost 105) in Marblemount. The old culverts were barriers to fish passage and were replaced with structures that will allow…
Project
SR 20/UNT to Coal Creek - Fish Passage
Timeline: Spring 2024 to Fall 2025
This project will replace the existing 6-foot concrete box culvert with a new 20-foot-wide fish passage structure under State Route 20, located between Coal Creek Lane and Hoehn Road (milepost 70), east of Sedro-Woolley. This upgrade is part of WSDOT’s ongoing efforts to improve fish passage and…
Project
SR 202 Skunk Creek and SR 203 Unnamed Tributaries to Snoqualmie River - Fish Passage
Timeline: Spring 2023 - Fall 2026
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where roads act as barriers. In Western Washington, that means replacing culverts and building hundreds of bridges and structures beneath state highways by 2030 to open more habitat for native and…
Project
SR 202/Evans Creek – Fish Passage and Adaptive Management
Timeline: Summer 2024 - Summer 2025
This project will remove a fish passage barrier along Evans Creek at State Route 202 just west of 236th Avenue Northeast near Sammamish. Contractor crews working for WSDOT will remove an existing 6-foot box culvert and fish ladder and replace it with a fish-passable structure. This new structure…
Project
SR 202/Mud Creek to Snoqualmie River - Fish Passage Project
Timeline: Construction begins in 2027 and runs through 2028.
This project will remove the fish barrier on State Route 202 just east of Fall City at Mud Creek. The project will also improve the safety and reliability of SR 202 by addressing the need for frequent emergency maintenance and channel dredging at the crossing due to sedimentation and flooding of…
Project
SR 202/Sammamish Creek fish passage
Timeline: July 2024 - Fall 2024
In July 2024, WSDOT began replacing two culverts near the intersection of State Route 202 and Northeast 124th Street between Redmond and Woodinville with a single culvert. Two creeks in the area — an unnamed tributary of the Sammamish Creek and High School Creek — will be realigned to merge with…
Project
SR 203/High Rock Rd & 203rd St SE – Intersection Improvement
Timeline: May 2024 - May 2025
Beginning in May 2024, contractors working on behalf of WSDOT built a unique compact roundabout at the intersection of SR 203, High Rock Road and 203rd Street Southeast to improve both mobility and safety between Monroe and Duvall.
Project
SR 203/Slough Bridge Vic to Kelly Rd NE Vic-Stormwater Retrofit
Timeline: Spring 2025 – Spring 2026
This project will install vegetative filter strips on the side of State Route 203 just north of Fall City (milepost .69) and at Northeast 77th Street (milepost 7.69). The vegetative filter strips will treat stormwater running off the roadway to help protect nearby wetlands and sensitive areas.
Project
SR 204/Unnamed Tributary to Ebey Slough Fish Passage
Timeline: Spring 2022 - Winter 2026
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where our roads act as barriers. In western Washington, that means building hundreds of fish passable structures under state highways in the next decade to create habitat gain essential for…
Project
SR 240 Richland Corridor improvements
Timeline: Spring/Summer 2025
The Washington State Department of Transportation and contractor crews are building new lanes for drivers to merge on and off SR 240 safely. Crews will also install a noise wall along the south portion of SR 240 along the Moon River RV Resort, and update traffic signals, pedestrian crossings,…
Project
SR 241 - Mabton Vicinity - Retrofit Bridges - Complete December 2024
Timeline: Summer 2023 - Late Fall 2024
This project removed the weight restrictions and restored the structural integrity of the Mabton area bridges. The slough bridge was replaced, and the bridge over the Yakima River was retrofitted and repaired.
Project
SR 25 - Emergency Culvert Replacement - Complete October 2024
Timeline: June 2024 - August 2024
This project will remove and replace a failed culvert and reconstruct the existing roadway embankment approximately two miles north of Hunters on State Route 25 that failed in April of 2023 after a major rainfall.
Project
SR 26 & I-90 – Eastern Region 2025 Bridge Repair
Timeline: April 2025 - August 2025
This project will rehabilitate the concrete bridge decks on a pair of bridges in Adams County. The first bridge is located on eastbound I-90 that crosses over SR 21 approximately 15 miles west of Ritzville. The second structure is located on SR 26 that crosses over an abandoned railroad just…
Project
SR 26 - SR 261 to Colfax - Rumble Strips Installation - Complete July 2023
Timeline: May 2023 - June 2023
This project improves safety along State Route 26 in Whitman County by installing shoulder rumble strips. There is a documented history of fatal and serious injury, single-vehicle, run-off-the-road crashes at these locations. Engineering analysis indicates that the installation of shoulder rumble…
Project
SR 26 and First Avenue intersection - Safety Improvement
Timeline: June 2025-October 2025.
The project will install a compact roundabout at the intersections of SR 26 and First Avenue. The I2 crash prevention program for systemic treatment at intersection selected this location for a compact roundabout due to existing crash patterns.
Project
SR 26 Dusty to Colfax - Add Climbing Lanes - Complete October 2024
Timeline: June 2022 - September 2024
This project will create three truck climbing lanes, or passing lanes, for vehicles who travel along SR 26 between Dusty and Colfax in Whitman County. One climbing lane will be built westbound and two will be built eastbound on SR 26. The Washington legislature approved the addition of a fourth…
Project
SR 26 – Dusty to Colfax – Add fourth climbing lane - Complete October 2024
Timeline: June 2024 - September 2024
This project will create a fourth truck climbing lane, or passing lane, for vehicles who travel along SR 26 between Dusty and Colfax in Whitman County. Three climbing lanes were constructed on this section of SR 26 between 2022 and 2023. The Washington legislature approved the addition of a fourth…
Project
SR 270 – Bishop Blvd. to Idaho State Line - Paving - Complete September 2023
Timeline: Spring 2023 - Summer 2023
This project will rehabilitate roughly 6 miles of SR 270 from Bishop Blvd. to the Idaho State Line in Whitman County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and…
Project
SR 28 White Trail Rd. Roundabout - Complete June 2023
Timeline: 2020- Fall 2023
This project improved safety by constructing a roundabout at the intersection of SR 28 and White Trail Rd. west of the City of Quincy.
Project
SR 28 - East Wenatchee Corridor Improvements
Timeline: Spring 2020 - Winter 2029
The East Wenatchee Corridor Improvement project will enhance safety and mobility along Sunset Highway in East Wenatchee between 9th Street and Hadley Street. This project includes Phases 3 & 4 of the larger “Eastside Corridor Project” to improve north-south mobility through East Wenatchee.…
Project
SR 28 and SR 21 - in Odessa - Paving and Complete Streets
Timeline: Spring 2025 - Summer 2027
This project will rehabilitate both SR 21 and SR 28 within the city limits of Odessa in Lincoln County. The roadway is past its expected lifespan and due for replacement. Along with repaving the roadway, complete streets will be used to look at active transportation within the city limits.
Project
SR 282 Nat Washington Blvd - Safety Improvement
Timeline: June 2026-September-2026
This project will install a compact roundabout at the intersection of SR 282 and Nat Washington Way, to enhance safety and reduce collisions. Installing a roundabout has proven safer than the existing turns and safer than installing traffic signals.
Project
SR 290 - Spokane River East Trent Bridge - Complete July 2023
Timeline: June 2020 - July 2023
The East Trent Bridge spanning over the Spokane River near Gonzaga University campus is due for replacement. Crews will demolish and rebuild the structure which has stood since 1910.
Project
SR 3 - Chico Creek - Remove Fish Barriers - Completed November 2024
Timeline: September 2021 - November 2024
This project replaced several barriers to fish beneath SR 3 and its southbound on- and off-ramps. The project built new SR 3 bridges over Chico Creek, realigned the on- and off-ramps, built an elevated bridge on Chico Way NW and rerouted Chico Creek beneath SR 3.
Project
SR 3 - Freight Corridor - New Alignment
Timeline: 2027 - 2029
Crews will create a new route for SR 3 while maintaining the existing state highway through Belfair as a business loop. The proposed 6-miles of new highway would provide a new option for drivers to travel around and not through Belfair. The new portion of SR 3 is a Limited Access Corridor. A…
Project
SR 3, SR 16 and SR 166, Gorst Vicinity - Remove Fish Barriers
Timeline: 2026 - 2029
This project will remove barriers to fish migration under State Route 3, SR 16 and SR 166 in Kitsap County. New bridges or larger culverts will replace five outdated culverts. Work includes construction of a roundabout at the SR 3, SR 16 and West Sam Christopherson Avenue intersection.
Project
SR 3/SR 304 to SR 303 - Paving - Complete October 2023
Timeline: July 2023 - October 2023
Workers repaved sections of northbound SR 3 between Bremerton and Silverdale. Repairs also were made at five bridges.
Project
SR 302 - E of Elgin Clifton Rd to SR 16 - Remove fish barriers, paving and ADA compliance
Timeline: Spring 2019 - Fall 2022
In summer 2022, our contractor began fish barrier corrections to replace two outdated culverts at Little Minter Creek under State Route 302. Since 2019, crews have completed paving and ADA ramp work for eight miles of SR 302 in addition to correcting three identified barriers to salmon and resident…
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.