Legislative reports archive

See legislative reports for past bienniums.

Legislative reports for the 2023-2025 biennium
Original bill numberOriginal sectionStudy title/ topicReport due date
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 311KB)7/1/2023
ESHB 1125220
(2) & (3)
Judgments & Settlements Report - Ferries and Non-Ferries (PDF 104KB)8/15/2023
Semi-Annually
ESHB 1125305 (16) (c)WA-OR Bistate Agreement Report (PDF 49.3KB)8/15/2023
Quarterly
RCW 81.104.11592022 Rail Fixed Guideway Public Transportation System Safety Report (PDF 6.81MB)8/31/2023
Annually
ESHB 1125221 (11) (a)Tribal Transit Mobility Report (PDF 1.18MB)9/1/2023
ESHB 1125221 (11) (a)Tribal Transit Mobility Grant Program Prioritized List of Projects (PDF 778KB)9/1/2023
ESHB 1125223 (1)Amtrak Cascades Service Restoration - Status Report (PDF 143KB)9/1/2023
SSB 5975303 (3) (c)Move Ahead Washington Stormwater Retrofit Report (PDF 588KB)9/19/2023
SSB 5165
ESSB 5689
218 (7)
305 (2)
South Pierce Multimodal Connectivity Study (PDF 21.3MB)10/6/2023
RCW 70A.535.0605 (b)Clean Fuels Standard - Detailed Projection of Credit Revenues (PDF 411KB)11/1/2023
Annually
ESHB 1125216Encampment Report - November 2023 (PDF 466KB)11/1/2023
ESHB 1125305 (12) (c)Statewide Culvert Remediation Plan Update (PDF 71.8KB)11/1/2023
ESHB 1125305 (12) (e)Amounts of federal funding received for fish passage barrier corrections (PDF 141KB)11/1/2023
Semi-Annually
ESHB 1125609 (2)Local Partner Cooperative Agreements (PDF 138KB)11/1/2023
ESHB 1125309 (2) (b)Prioritized List of Any FRIB Loans Recommended (PDF 34.4KB)11/15/2023
ESHB 1125606Amounts expended for transit, bicycle, pedestrian (PDF 184KB)11/15/2023
ESHB 1125217 (11)Lower Snake River Dam Transportation Study - November 2023 (PDF 157KB)11/15/2023
Quarterly
ESHB 1125312Capital Projects Report, Quarter 1 (PDF 694KB)11/15/2023
Quarterly
ESHB 1125601Transfers (PDF 96.4KB)11/15/2023
Quarterly
ESHB 1125601 (1) (l)Administrative Transfers, Quarter 1 (PDF 160KB)11/15/2023
ESHB 1125305 (16) (c)WA-OR Bistate Agreement Report - November 2023 (PDF 188KB)11/15/2023
Quarterly
ESHB 1125

209 (2)


209 (4)


 
FY2023 Toll Division Annual Report (PDF 4.04MB)

I-405 Express Toll Lane Project Performance Measure Reports (PDF 4.04MB)

The Use of Consultants (PDF 4.04MB)
Non-Vendor Costs (PDF 4.04MB)
Vendor-Related Costs (PDF 4.04MB)
Toll Adjudication Process (PDF 4.04MB)
Summary of Toll Revenue by facility (PDF 4.04MB)
11/30/2023
Annually
ESHB 1125215 (12)

223 (4)

304
 
Truck Parking Status Report (PDF 53.4KB)

Status Report - I-5 Truck Parking Availability System (PDF 53.4KB)

Truck Parking Expansion Opportunities at SRA's and CV Inspection sites - Status Report (PDF 53.4KB)
12/1/2023
ESHB 1125217 (8)Virtual Coordination Center Report (PDF 285KB)12/1/2023
ESHB 1125219 (9) (d)I-5 Strategic Corridor Opportunities Report, December 2023 (PDF 545KB)12/1/2023
ESHB 1125222 (5)WSF Passenger Demographic Survey Report (PDF 2.02MB)12/1/2023
ESHB 1125222 (6)WSF Anacortes to San Juan Islands Walk-on Ridership Maximization Study (PDF 1.61MB)12/1/2023
ESHB 1125222 (18) (b)WSF Joint Training and Recruitment Plan (PDF 99.4KB)12/1/2023
ESHB 1125305 (7) (d)Program I Allotment Modifications (PDF 147KB)12/1/2023


ESHB 1125


SSB 5742

RCW 47.04.390


310 (3)


5


5
Active Transportation Funding Programs Report, December 2023
(PDF 2.07KB)

Pedestrian safety, safe routes to school, & connecting communities report (PDF 2.07KB)

Bicyclist and Pedestrian and Safe Routes to School Grant Programs projects (PDF 2.07KB)

Statewide School-Based Bicycle Education Grant Program Report (PDF 2.07KB)
12/1/2023
ESHB 1125310 (21)Program Z Allotment Modifications (PDF 97.8KB)12/1/2023
ESHB 1125224 (7)Civilian Intervention Programs Report, December 2023 (PDF 118KB)12/1/2023 Annually
ESHB 1125308 (8)Volkswagen Settlement Funding Grant Application Report (PDF 67.2KB)12/1/2023
RCW 47.01.435

ESHB 1125
6

218 (1) (b)
Highway Construction Workforce Development Report (PDF 1.84MB)

Minority and Women's Business Enterprise Support Services Program (PDF 1.84MB)
12/1/2023
Annually

RCW 35.58.2796

RCW 47.66.110


2 (a)

6
2023 Transit Integration Report (PDF 680KB)

Summary of the status of the public transportation system coordination. (PDF 680KB)

Report on the transit coordination grants that were awarded. (PDF 680KB)
12/1/2023
Annually


47.66.100

47.66.030

ESHB 1125

47.66.120

47.66.130

47.66.080

47.06.110

70A.15.4060

70A.15.4100

47.01.330
 


3

1 (a)

221 (5) (a)

4


4




6

6


 
2023 Public Transportation Mobility Report (PDF 4.71MB)

Rural mobility grants (PDF 4.71MB)

Regional mobility grants prioritized list (PDF 4.71MB)

Regional Mobility Grant Program Status Report (PDF 4.71MB)

Green Transportation Capital Grant Program project status update. (PDF 4.71MB)

State Buses and Bus Facilities Grant Program (PDF 4.71MB)

Grant Program Examination (PDF 4.71MB)

Report summarizing the Public Transportation Plan progress (PDF 4.71MB)

State Commute Trip Reduction Board Report (PDF 4.71MB)

State Agency Commute Trip Reduction Program (PDF 4.71MB)

Office of Transit Mobility Report (PDF 4.71MB)
12/1/2023
Annually
RCW 35.58.279612022 Summary of Public Transportation (PDF 31.4MB)12/1/2023
Annually
ESHB 1125214 (3)Gateway Program Surplus Property Appraisal Report, November 2023 (Northern Parcel of Site 14) (PDF 149KB)12/15/2023
ESHB 1125217 (1)2021-2023 Low-Cost Enhancement Projects Report (PDF 2.90MB)12/15/2023
Every odd numbered year
ESHB 1125217 (5)2021-23 Pedestrian and Bicyclist Emergent Issues Report (PDF 729KB)12/15/2023
Every odd numbered year
ESHB 1125222 (12)WSF Anacortes/Sidney, BC Ferry Route Vessel Search Report (PDF 3.87MB)12/15/2023
ESHB 1125307 (1)21-23 Transportation Operations Capital Projects Report (PDF 558KB)12/15/2023
Every odd numbered year
SSB 5165306 (17)North Lewis County Industrial Access Transportation Study (PDF 40MB)12/21/2023
RCW 47.64.3602FY2023 WSF Performance Measures Report (PDF 860KB)12/31/2023 Annually
RCW 47.04.4101 (e)Reducing Rural Roadway Departures Program Report (PDF 277KB)12/31/2023 
Annually
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 273KB)1/1/2024
RCW 47.60.830 Annual Diesel Fuel Price Hedging Report - FY23 (PDF 458KB)1/1/2024
Annually
SSB 57423
4
Freight Rail Investment Bank Loans (PDF 90KB)
Freight Rail Assistance Program (PDF 90KB)
2/1/2024
Annually
ESHB 1125217 (11)Lower Snake River Dams Transportation Study - January 2024 (PDF 145KB)2/15/2024
Quarterly
ESHB 1125220
(2) & (3)
Judgments & Settlements Report - Ferries and Non-Ferries (PDF 119KB)2/15/2024
Semi-Annually
ESHB 1125312Capital Projects Quarterly Report, Quarter 2 (PDF 846KB)2/15/2024
Quarterly
ESHB 1125601Transfers (PDF 118KB)2/15/2024
Quarterly
ESHB 1125305 (16) (c)WA-OR bistate agreements - February 2024 (PDF 186KB)2/15/2024
Quarterly
RCW 47.01.4852Report on any local permit application that takes longer than 90 days (PDF 128KB)3/1/2024
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations occurring during the preceding year (PDF 283KB)3/1/2024
Annually
ESHB 1125607 (1)Project Scope Change - SR 520 Seattle Corridor Improvement - West End (PDF 107KB)4/19/2024
ESHB 1125216Public Health Associated with  Homeless Encampments on Department Owned Rights of Way, April 2024 (PDF 422KB)5/1/2024
ESHB 1125305 (12) (e)Amounts of federal funding received for fish passage barrier corrections (PDF 91KB)5/1/2024
Semi-Annually
ESHB 2134217 (9)Lower Snake River Dams Transportation Study - April 2024 (PDF 155KB)5/15/2024
Quarterly
ESHB 1125312Capital Projects Quarterly Report, Quarter 3 (PDF 400KB)5/15/2024
Quarterly
ESHB 2134501Transfers (PDF 93.3KB)5/15/2024
Quarterly
ESHB 1125305 (16) (c)WA-OR bistate agreements - May 2024 (PDF 193KB)5/15/2024
Quarterly
ESHB 2134219 (10)Community Outreach, Education & Technical Assistance Program (PDF 93.6KB)6/1/2024
ESHB 1125305 (12) (c)Statewide Culvert Remediation Plan Update - June 2024 (PDF 119KB)6/1/2024
ESHB 1125219 (1)Interim Report - Implementation of VMT Targets and Supporting Actions (PDF 167KB)6/30/2024
ESHB 1125223 (2) (b)Cascadia High-Speed Rail Project Status Update - June 2024 (PDF 252KB)6/30/2024
RCW 81.104.11592023 Rail Fixed Guideway Public Transportation System Safety Report (PDF 1.45MB)6/30/2024
Annually
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 271KB)7/1/2024
ESHB 1125310 (16) (d)Policy Brief on Designing and Evaluating Electric-Bicycle Incentive Programs - June 2024 (PDF 703KB)7/1/2024
ESHB 1125607 (1)Project Scope Change - North Lewis County Industrial Access (PDF 71KB)8/1/2024
ESHB 1125220
(2) & (3)
Judgments & Settlements Report - Ferries and Non-Ferries (PDF 208KB)8/15/2024
Semi-Annually
ESHB 2134217 (9)Lower Snake River Dams Transportation Study - July 2024 (PDF 156KB)8/15/2024
Quarterly
ESHB 1125312Capital Projects Quarterly Report, Quarter 4 (PDF 868KB)8/15/2024
Quarterly
ESHB 2134501Transfers (PDF 114KB)8/15/2024
Quarterly
ESHB 1125305 (16) (c)WA-OR bistate agreements - August 2024 (PDF 191KB)8/15/2024
Quarterly
RCW 81.104.1159Rail Fixed Guideway Public Transportation System Safety Report8/31/2024
Annually
ESHB 1125219 (3)Performance-Based Project Evaluation Model Implementation Report (PDF 246KB)9/1/2024
ESHB 2134221 (12) (a)Tribal Transit Mobility Report (PDF 594KB)

Tribal Transit Mobility Grant Program Prioritized List of Projects (PDF 603KB)
9/1/2024
SSB 5975303 (3)Move Ahead Washington Stormwater Retrofit Report - September 2024 (PDF 798KB)9/26/2024
RCW 47.01.49542024 Construction Program Business Plan (PDF 2.30MB)9/30/2024
Biennially
ESHB 2134217 (11)Highway Speed Safety Camera Pilot Program Report (PDF 290KB)9/30/2024
ESHB 1125211 (2)WSDOT Space Use Study (PDF 4.66MB)10/1/2024
ESHB 1125213 (2)Sustainable Aviation Grant Program Report - October 2024 (PDF 118KB)10/1/2024
RCW 47.04.285 2024 Biennial Transportation Attainment Report (PDF 450KB)10/1/2024
Biennially
ESHB 1125304 (2) (b)Prioritization of Facility Preservation Needs and Repair Report (PDF 726KB)10/15/2024
ESHB 2134222 (22)Return of state provided passenger-only ferry service Progress Report - October 2024 (PDF 206KB)10/30/2024
ESHB 2134216 (3)Encampment Report - November 2024 (PDF 1.21MB)11/1/2024
ESHB 1125305 (12) (e)Amounts of federal funding received for fish passage barrier corrections (PDF 20.8KB)11/1/2024
Semi-Annually
RCW 70A.535.0605 (b)Clean Fuels Standard - Detailed Projection of Credit Revenues (PDF 1.24MB)11/1/2024
Annually
ESHB 2134308 (6)2025-27 FRAP & FRIB Recommended Prioritized Lists (PDF 243KB)11/15/2024
ESHB 2134502Amounts expended for transit, bicycle, pedestrian - FY2024 (PDF 182KB)11/15/2024
ESHB 2134217 (9)Lower Snake River Dams Transportation Study - October 2024 (PDF 188KB)11/15/2024
Quarterly
ESHB 1125312Capital Projects Quarterly Report, Quarter 5 (PDF 1.08MB)11/15/2024
Quarterly
ESHB 2134501Transfers (PDF 24.3KB)11/15/2024
Quarterly
ESHB 1125305 (16) (c)WA-OR bistate agreements - November 2024 (PDF 57.2KB)11/15/2024
Quarterly
ESHB 2134

209 (2)


209 (4)


 
FY2024 Toll Division Annual Report (PDF 3.81MB)

I-405 Express Toll Lane Project Performance Measure Reports (PDF 3.81MB)

The Use of Consultants (PDF 3.81MB)
Non-Vendor Costs (PDF 3.81MB)
Vendor-Related Costs (PDF 3.81MB)
Toll Adjudication Process (PDF 3.81MB)
Summary of Toll Revenue by facility (PDF 3.81MB)
11/30/2024
Annually
ESHB 2134
215 (7)

303 (3)

304 (30)
Washington State Truck Parking Implementation Plan (PDF 4MB)

Identify private land parcels for potential development of trucking parking sites (PDF 4MB)

Truck parking expansion opportunities at SRA's and CV inspection sites (PDF 4MB)

Pursue Federal Grant opportunities to develop and implement a technology-based Truck parking availability system along I-5 (PDF 4MB)
12/1/2024
RCW 14.40.020 State Commercial Aviation Work Group Progress Report - November 2024 (PDF 105KB)12/1/2024
Annually
ESHB 2134224 (7)Active Transportation Budget Program Report (PDF 823KB)12/1/2024
ESHB 2134224 (10)Multiagency Permit Program Report (PDF 246KB)12/1/2024
ESHB 2134223 (4)Amtrak Cascades Service Update - December 2024 (PDF 511KB)12/1/2024
ESHB 2134217 (8)Snoqualmie Winter Operations Study (PDF 18.3MB)12/1/2024
SHB 19891 (d)Graffiti Abatement and Reduction Pilot Program Report (PDF 935KB)12/1/2024
ESHB 1125219 (9) (b)I-5 Master Plan Future Phases and Funding Plan Report (PDF 3.60MB)12/1/2024
ESHB 1125219 (9) (c)I-5 Ramp Reconfiguration Study (PDF 9MB)

Appendix A - Existing Transportation Conditions - Ramp Area Details (PDF 27.2MB)

Appendix B - Transportation Workshop Summary (PDF 284KB)
12/1/2024
ESHB 2134221 (19)Travel Washington Intercity Bus Program Update (PDF 24MB)12/1/2024
ESHB 1125222 (18) (b)Report of findings on Joint Training and Recruitment Plan effectiveness and recommendations12/1/2024
ESHB 2134304 (7) (d)Program I Appropriation Modifications (PDF 238KB)12/1/2024
ESHB 2134307 (7)WSF Terminal Wait Time Assessment Project - Concept of Operations (PDF 3.11MB)12/1/2024


ESHB 2134
SSB 5742
RCW 47.04.390


309 (3)
5
5
Active Transportation Funding Programs Report (PDF 3.69MB)

Pedestrian Safety, Safe Routes to School, & Connecting Communities Report (PDF 3.69MB)
Bicyclist and Pedestrian and Safe Routes to School Grant Programs Projects (PDF 3.69MB)
Statewide School-Based Bicycle Education Grant Program Report (PDF 3.69MB)
12/1/2024
ESHB 2134309 (20)Program Z Allotment Modifications (PDF 205KB)12/1/2024
ESHB 2134224 (5)Civilian Intervention Programs Report, December 2024 (PDF 228KB)12/1/2024 Annually
ESHB 2134309 (6)Federal Fund Exchange Pilot Program, FFY2024 (PDF 226KB)12/1/2024
ESHB 2134309 (15)Traffic Conflict Screening Using Video Analytics Report (PDF 471 KB)12/1/2024
ESHB 1125212 (1)2024 Obsolete Equipment and Fuel Site Replacement Status Report (PDF 1.51MB)12/1/2024
Annually
RCW 47.01.435

ESHB 1125 
6

218 (1) (b)
Highway Construction Workforce Development Report (PDF 1.12MB)

Minority and Women's Business Enterprise Support Services Program (PDF 1.12MB)
12/1/2024
Annually
ESHB 1125218 (2)Community Workforce Agreement and Diversity, Equity and Inclusion Progress Report - December 2024 (PDF 330KB)12/1/2024
ESHB 1125218 (3)Small Business Enterprise Set-Aside Report - November 2024 (PDF 181KB)12/1/2024


RCW 47.66.100

RCW 47.66.030

RCW 47.66.120

RCW 47.66.130

RCW 35.58.2796

RCW 47.06.110

RCW 47.01.330


3

3

4

4

2 (a)

6

5
2024 Public Transportation Mobility Report (PDF 6.87MB)

Rural Mobility Grant Program (PDF 6.87MB)

Regional Mobility Grant Program (PDF 6.87MB)

Grant Transportation Capital Grant Program  (PDF 6.87MB)

State Buses and Bus Facilities Grant Program (PDF 6.87MB)

Transit Integration in the Puget Sound Region (PDF 6.87MB)

State Public Transportation Plan (PDF 6.87MB)

Office of Transit Mobility (PDF 6.87MB)
12/1/2024
Annually
RCW 47.66.0301 (a)2025-2027 Regional Mobility Grant Program Prioritized Project List (PDF 539KB)12/1/2024
Annually
RCW 35.58.279612023 Summary of Public Transportation (PDF 31.5MB)12/1/2024
Annually
RCW 47.66.1201 (a)2025-2027 Green Transportation Capital Grant Program Prioritized Project List (PDF 498KB)12/1/2024
ESHB 2134222 (5)Compare passenger demographics study to composition of Ferry Advisory Committees12/1/2024
ESHB 2134222 (6)Report on feasible near to medium term solutions identified in study for Walk-On Riders (Anacortes-San Juan Islands)12/1/2024
ESHB 2134209 (9)520 Bridge Self-Insurance Actuarial Analysis12/15/2024
ESHB 2134214 (8)Fish Passage Cost Management Report (PDF 514KB)12/15/2024
ESHB 2134304 (21) (a)Portage Bay Bridge and Roanoke Lid Project Cost Savings Report (PDF 371KB)12/15/2024
ESHB 2134222 (20)Status of efforts to increase the staff available for maintaining the customary level of ferry service, including staff for deck, engine, and terminals.12/31/2024
Annually
RCW 47.64.3602FY2024 WSF Performance Measures Report (PDF 859KB)12/31/2024
Annually
RCW 47.04.4101 (e)Reducing Rural Roadway Departures Program Report - December 2024 (PDF 185KB)12/31/2024 
Annually
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 347KB)1/1/2025
RCW 47.60.830 Annual Diesel Fuel Price Hedging Report - FY24 (PDF 726KB)1/1/2025
Annually
ESHB 2134214 (7)Alternative Use of the State's Highway Rights-of-Way (PDF 1.19MB)1/15/2025


RCW 47.76.460
RCW 47.76.470


3
3
2023-2025 FRIB and FRAP Progress Report (PDF 205KB)

Freight Rail Investment Bank Loans (PDF 205KB)
Freight Rail Assistance Program (PDF 205KB)
2/1/2025
Annually
ESHB 1125220
(2) & (3)
Judgments & Settlements Report - Ferries and Non-Ferries (PDF 244KB)2/15/2025
Semi-Annually
ESHB 2134217 (9)Lower Snake River Dams Transportation Study - January 2025 (PDF 352KB)2/15/2025
Quarterly
ESHB 1125312Capital Projects Quarterly Report, Quarter 6 (PDF 477KB)2/15/2025
Quarterly
ESHB 2134501Transfers (PDF 88KB)2/15/2025
Quarterly
ESHB 1125305 (16) (c)WA-OR bistate agreements - February 2025 (PDF 213KB)2/15/2025
Quarterly
RCW 47.01.4852Report on any local permit application that takes longer than 90 days (PDF 185KB)3/1/2025
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations occurring during the preceding year (PDF 262KB)3/1/2025
Annually
RCW 47.01.490 Engineering Error Report - Contract 9622, I-5 Seneca St Vic to SR 520 - Mobility Improvements (PDF 885KB)3/21/25
ESHB 1125216 (3)Encampment Report - April 2025 (PDF 3.06MB)5/1/2025
ESHB 1125305 (12) (e)Amounts of federal funding received for fish passage barrier corrections (PDF 46KB)5/1/2025
Semi-Annually
ESHB 2134217 (9)Lower Snake River Dams Transportation Study - April 2025 (PDF 291KB)5/15/2025
Quarterly
ESHB 1125312Capital Projects Quarterly Report, Quarter 7 (PDF 539KB)5/15/2025
Quarterly
ESHB 2134501Transfers (PDF 43.3KB)5/15/2025
Quarterly
ESHB 1125305 (16) (c)WA-OR bistate agreements - May 2025 (PDF 182KB)5/15/2025
Quarterly
ESHB 1125213 (3)Advanced Air Mobility Aircraft Plan (PDF 3.95MB)6/1/2025
ESHB 2134219 (10)Community Outreach, Education and Technical Assistance Program Final Report (PDF 479KB)6/1/2025
ESHB 2134221 (27)Rideshare Pilot Program Summary Report (PDF 587KB)6/1/2025
ESHB 2134222 (22)Washington State Ferries Passenger-Only Ferry Study Final Report, June 2025 (PDF 8.05MB)6/1/2025
ESHB 1125219 (1)Implementation of VMT Targets and Supporting Actions - Final Report6/30/2025
ESHB 2134219 (12)Progress Report - Low-carbon transportation planning efforts for the 2026 FIFA world cup soccer matches, including best practices for future events.6/30/2025
ESHB 2134221 (25)Report on Frequent Transit Services Data Collection Efforts6/30/2025
ESHB 2134217 (10)2023-25 Wrong Way Driving Report (PDF 14.5MB)6/30/2025
RCW 81.104.1159Rail Fixed Guideway Public Transportation System Safety Report6/30/2025
Annually
ESHB 1125212 (2)Intelligent Speed Monitoring Technology Pilot Project Report6/30/2025
ESHB 1125223 (2) (c)Establishing an Ultra High Speed Ground Transportation Coordinating Entity 6/30/2025
ESHB 2134224 (4)Cycle Highways Report6/30/2025
ESHB 1125310 (16)(d)E-bike Rebate Program Final Policy Brief and Report7/1/2025
RCW 14.40.020 State Commercial Aviation Work Group Progress Report7/1/2025
Annually
RCW 46.63.20010Report on data and efficacy of Speed Safety Camera Systems.7/1/2025
Annually
ESHB 2134217 (9)Lower Snake River Dams Transportation Study8/15/2025
Quarterly
ESHB 1125312Capital Projects Quarterly Report8/15/2025
Quarterly
ESHB 2134501Transfers8/15/2025
Quarterly
ESHB 1125305 (16) (c)WA-OR bistate agreements8/15/2025
Quarterly
ESHB 1125212 (1)Obsolete equipment & replacing of fuel sites12/1/2025
Annually
RCW 47.66.080 Grant Program Examination12/1/2025
Odd-numbered years
Legislative reports for the 2021-2023 biennium
Orig Bill
No
Orig
Sect
Study Title/ TopicReport
Due Date
SSB 51651004 (3)
1005 (3)
Transfer: MVA State and Federal Appropriations (PDF 222KB)8/13/2021
SSB 5165306 (9) (b)
209 (8)
I-405/SR 167 Financial Plan Interim Report and Appendices (PDF 2.22MB)9/15/2021
SSB 5165215 (9)Public Health Association with Homeless Encampments on Department owned rights of way (PDF 994KB)10/1/2021
(semi-annually thereafter)
SHB 15144Commute Trip Reduction Program Report - September 2021 (PDF 696KB)10/1/2021
SSB 5165306 (13) (b)Statewide Culvert Remediation Plan Report (PDF 83.6KB) 11/1/2021
SSB 5165310 (2)Supplemental Freight Rail Investment Bank Project List (PDF 53.9KB)11/15/21
SSB 5165606Amounts expended for transit, bicycle, pedestrian elements (PDF 141KB)11/15/21
(Annually)
SSB 5165313Capital projects report - Quarter ending September 30, 2021 (PDF 1.54MB)11/15/21
Quarterly
SSB 5165601 (1) (l)Administrative Transfers11/15/21
Quarterly
SSB 5165601Transfers (PDF 35.9KB)11/22/21
SSB 5165213 (4)Broadband facilities consolidation report (PDF 105 KB)12/1/2021
SSB 5165306 (12) (c)I-5 Interstate Bridge Replacement project Progress Report (PDF 1.77MB)12/1/2021
RCW 47.01.435

SSB 5165
6

917 (1)
Highway Construction Workforce Development Report (PDF 809KB)

Apprenticeship Program Grant Awards (PDF 809KB)
12/1/2021
Annually
SSB 5165311 (3)Pedestrian Safety/Safe Routes to school grant program report (PDF 909KB)12/1/2021
RCW 47.66.100
RCW 47.66.030
RCW 47.66.030
RCW 47.66.120
SSB 5165
SSB 5165
RCW 47.66.080
RCW 47.06.110
RCW 70A.15.4060
RCW 70A.15.4100
RCW 47.01.330
3
3
1 (a)
4
220 (5)
220 (7) (b)

6
6
6
5
2021 Washington State Transportation Mobility Report (PDF 9.22MB)

Rural mobility grant program (PDF 9.22MB)
Regional mobility grant program (PDF 9.22MB)
Regional mobility grants prioritized project list (PDF 9.22MB)
Green Transportation Capital Grant Program project status update (PDF 9.22MB)
Region mobility grant Projects (PDF 9.22MB)
First Mile/Last Mile Connections (PDF 9.22MB)
Grant Programs Examination (PDF 9.22MB)
Report Summarizing the Public Transportation Plan progress (PDF 9.22MB)
Commute Trip Reduction Program (PDF 9.22MB)
State Agency Commute Trip Reduction Program (PDF 9.22MB)
Office of Transit Mobility (PDF 9.22MB)

 
12/1/2021
Annually


RCW 35.58.2796
RCW 47.66.110
 


2 (a)
6
 
2021 Transit Integration Report (PDF 3.15MB)

Annual report summarizing the status of the public transportation system coordination (PDF 3.15MB)
Report on the transit coordination grants that were awarded (PDF 3.15MB)
 
12/1/2021
Annually
RCW 35.58.279612020 Summary of Public Transportation (PDF 36.2MB)12/1/2021
Annually
SSB 5165209 (9)SR 520 Bridge Self-Insurance Evaluation (PDF 164KB)12/15/2021
SSB 5165216 (1)2019-2021 Low-cost enhancement projects (PDF 8.79MB)12/15/2021
(odd number years)
RCW 47.01.4801 (a)Practical Design-related Title & Scope Change Request - I-5 Rebuild Chamber Way Interchange Improvements (PDF 187KB)12/16/2021
SSB 5165218 (3)Vehicle Miles Traveled Targets - Initial Technical Report (PDF 136KB)12/31/21
RCW 47.64.3602FY 2021 WSF Performance Measures Report (PDF 844KB)12/31/2021 Annually
SSB 5165306 (9) (b)
209 (8)
I-405/SR 167 Financial Plan Final Report and Appendices (PDF 2.64MB)1/1/2022
SSB 5165221 (5)Staffing and Overtime for Engine & Deck Crewmembers1/1/2022
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 224KB)1/1/2022
RCW 47.60.830 FY21 Annual Diesel Fuel Price Hedging Report (PDF 388KB)1/1/2022
Annually
SSB 5165308 (2)Challenge Seattle project report (PDF 552KB)1/15/2022
SSB 5165219 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 1 & 2 (PDF 123KB)2/15/2022
Semi-Annually
SSB 5165313Capital projects quarterly report - Quarter ending December 30, 2021 (PDF 2.10MB)2/15/2022
Quarterly
SSB 5165601 (1) (l)Administrative Transfers2/15/2022
Quarterly
SSB 5165719Commercial Aviation Coordinating Commission Report - Six Locations (PDF 396KB)2/15/2022
RCW 47.01.4852Local Governments Determination on Permits. (PDF 125KB)3/1/2022
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations. (PDF 464KB)3/1/2022
Annually
SSB 5156310 (2)'21-23 Freight Rail Investment Bank (FRIB) Progress Report (PDF 82.8KB)3/15/2022
Annually
ESSB 5689219 (4)Interim Report - Modular Expansion Joint Noise Mitigation Study (PDF 555KB)3/31/2022
SSB 5165215 (9)Address risks to safety and public health regarding homeless encampments4/1/2022
ESSB 5689311Capital projects quarterly report - Quarter ending March 31, 2022 (PDF 2.10MB)5/15/22
Quarterly
SSB 5165601 (1) (l)Administrative Transfers5/15/22
Quarterly
ESSB 5689305 (12) (c)I-5 Interstate Bridge Replacement project (PDF 1.33MB)6/1/2022
ESSB 5689305 (13) (b)Fish Passage Barrier Removal project (PDF 22.8KB)6/1/2022
ESSB 5689219 (3)Vehicle Miles of Travel Targets - Interim Report (PDF 470KB)6/22/22
ESSB 5689223 (2)Amtrak Cascades Service Development Plan - Progress Report (PDF 110KB)6/30/2022
RCW 81.104.11592021 Rail Fixed Guideway Public Transportation System Safety Report (PDF 1.37MB)6/30/2022
Annually
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 232KB)7/1/2022
ESSB 5689220 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 3 & 4 (PDF 126KB)8/15/22
Semi-Annually
ESSB 5689311Capital projects quarterly report - Quarter ending June 30, 2022 (PDF 2.10MB)8/15/22
Quarterly
ESSB 5689601 (1) (l)Administrative Transfers (PDF 347KB)8/15/22
Quarterly
RCW 47.01.4954Construction Program Business Plan (PDF 1.38MB)9/30/22
Biennially
SSB 5165103Report on evaluation of short term and long term facility and information technology needs (in light of increased levels of remote work). Study by OFM with collaboration with WSDOT and the Office of Chief Information Officer (OCIO).10/1/2022
RCW 47.04.285 2022 Biennial Transportation Attainment Report (PDF 426KB)10/1/2022
Biennially
ESSB 5689707State Commercial Aviation Coordinating Commission Report (PDF 140KB)10/15/2022
ESSB 5689216 (9)Public Health Associated with Homeless Encampments on Department Owned Rights of Way (PDF 452KB)11/1/2022
ESSB 5974412 (5) (b)Clean Fuels Program - State Transportation Investment Credit Revenue Generation Forecast (PDF 208KB)11/1/2022
Annually
ESSB 5689311Capital projects quarterly report - Quarter ending September 30, 2022 (PDF 1.14MB)11/15/22
Quarterly
SSB 5165601 (1) (l)Administrative Transfers11/15/22
Quarterly
ESSB 5689309  (2) & (6)FRAP/FRIB Prioritized List of Recommended Projects (PDF 113KB)11/15/2022
ESSB 5689602Amounts expended for transit, bicycle, pedestrian elements (PDF 198KB)11/15/22
(Annually)
ESSB 5689221 (16)Grants Management System (PDF 692KB)11/15/2022
ESSB 5689209 (2)


209 (5)
 
FY2022 Toll Division Annual Report (PDF 3.55MB)

I-405 Express Toll Lane Project Performance Measure Reports (PDF 3.55MB)

Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 3.55MB)
11/30/2022
SHB 13791 (3) &
2 (3)
Commercial Unpiloted Aircraft System Coordinator and Commercial Drone Registration Fee Review and Recommendations (PDF 409KB)12/1/2022
ESSB 5689216 (5)Safety Rest Area Free Coffee Program report (PDF 51.9KB)12/1/2022
SSB 5165209 (10)Provide updated recommendations for cost allocation12/1/2022
ESSB 5689305 (12) (c)I-5 Interstate Bridge Replacement Program Progress Report (PDF 1.46MB)12/1/2022
ESSB 5689310 (3)Pedestrian/Bike and Safe Routes to School Programs Project Lists and Update (PDF 2.15MB)12/1/2022
RCW 47.01.435

SSB 5165
6

917 (1)
Highway Construction Workforce Development Report (PDF 574KB)

Apprenticeship Program Grants Awards (PDF 574KB)
12/1/2022
Annually
SSB 5975209 (5)Executive Summary: Recommended Approach and Funding Request for I-5 causeway (PDF 997KB)12/1/2022
SSB 5975209 (5)I-5 Study Seismic Report and Funding Request Report (PDF 1.37MB)

Appendix A - Structure Location Maps (PDF 929KB)
Appendix B - Geotechnical Hazard Maps (PDF 950KB)
Appendix C, Part 1 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.6MB)
Appendix C, Part 2 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.8MB)
Appendix D - Retaining Walls and Embankments Analysis (PDF 369KB)
Appendix E - Seismic Vulnerability Analysis Study Example (PDF 1.42MB)
12/31/2022
ESSB 5689218 (3)Community Workforce Agreement and Diversity, Equity, & Inclusion Report (PDF 254KB)12/1/2022
SSB 5975211 (6)Tiered NL3 LEAP List - Prioritize Projects Based on Community Impacts (PDF 427KB)12/1/2022
ESSB 5689222 (18)WSF Training & Workforce Development Status Report (PDF 298KB)12/1/2022
ESSB 5974420Elimination of Fares for Amtrak Cascades Passengers 18 Years old and Under (PDF 113KB)12/1/2022
ESSB 5974417 (5)Connecting Communities Pilot Program Report (PDF 885KB)12/1/2022
ESSB 5974419 (5)School-Based Bicycle Safety Education Program Report (PDF 150KB)12/1/2022
SSB 5975204Sustainable Aviation Grant Program Report (PDF 203KB)12/1/2022
SSB 5975308 (2)Active Transportation Projects - Ranked NL-2 LEAP List (PDF 380KB)12/1/2022


RCW 47.66.030
RCW 47.66.100
RCW 47.66.120
ESSB 5689
ESSB 5689
RCW 47.01.330
RCW 47.06.110

3
4
221 (5)
221 (7) (b)
Washington State Public Transportation Mobility Report (PDF 9.49MB)

Regional mobility grants (PDF 9.49MB)
Rural Mobility Grants (PDF 9.49MB)
Green Transportation Capital Grant Project Project Status Update (PDF 9.49MB)
Regional Mobility Grant Projects (PDF 9.49MB)
First Mile/Last Mile Connection Grant Program's Effectiveness (PDF 9.49MB)
Office of Transmit Mobility Report (PDF 9.49MB)
Report Summarizing the Public Transportation Plan Progress (PDF 9.49MB)
12/1/2022
Annually
RCW 47.66.0301 (a)Regional mobility grants prioritized list (PDF 719KB)12/1/2022
Annually


RCW 35.58.2796

RCW 47.66.110


2 (a)

6
2022 Transit Integration Report (PDF 1.60MB)

Annual report summarizing the status of the public transportation system coordination (PDF 1.60MB)

Report on the transit coordination grants that were awarded(PDF 1.60MB)
12/1/2022
Annually
RCW 35.58.279612021 Summary of Public Transportation (PDF 34.9MB)12/1/2022
Annually
RCW 47.66.1201 (a)Green Transportation Capital Grant Program prioritized project list. (PDF 528KB)12/1/22
(even-numbered years)
ESSB 5689221 (15) Frequent Transit Service Study Initial Report (PDF 1.87MB)12/15/2022
RCW 47.64.3602FY2022 WSF Performance Measures Report (PDF 940KB)12/31/2022 Annually
ESSB 5689219 (4)Final Report of Reducing Noise Impacts from the SR 520 Expansion Joints (PDF 2.32MB)12/31/2022
RCW 47.01.4802 (b)Practical Designs Savings Report (PDF 293KB)1/1/2023
RCW 47.60.830 Annual Diesel Fuel Price Hedging Report - FY22 (PDF 367KB)1/1/2023
Annually
ESSB 5689210 (2)
211
214 (7)
216 (11)
217 (3)
218 (2)
219 (8)
Contingency Funding to Address Staff Vacancies (PDF 320KB)1/1/2023
ESSB 5689222 (21)Study on cost-effective strategies to maximize walk-on passenger of the Anacortes/San Juan ferry routes1/6/2023
ESSB 5689216 (15) (d)Safety Rest Area Report - Additional Operations and Maintenance Activities (PDF 625KB)1/15/2023
ESSB 5689216 (16) (f)Safety Rest Area Anti-Human Trafficking Informational Poster Report (PDF 113KB)1/15/2023
SHB 16552 (3)Implemented or Planned Changes to Safety Rest Area Operations (PDF 109KB)1/15/2023
ESSB 5689218 (4)Small Business Enterprise Set-Aside Report (PDF 125KB)1/31/2023
ESSB 5689308 (2)Semi-annual WSF Project Status Update2/2/2023
Semi-Annually
ESSB 5689220 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY23 Quarters 1 & 2 (PDF 257KB)2/15/23
Semi-Annually
ESSB 5689311Capital projects quarterly report - Quarter ending December 31, 2022 (PDF 1.03MB)2/15/23
Quarterly
ESSB 5689601 (1) (k)Administrative Transfers (PDF 253KB)2/15/23
Quarterly
RCW 47.01.4852Report on any local permit application that takes longer than 90 days. (PDF 122KB)3/1/2023
Annually
RCW 47.85.0405Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 275KB)3/1/2023
Annually
ESSB 5689309 (2)Freight Rail Investment Bank (FRIB) Progress Report (PDF 83.3KB)3/17/23
ESSB 5689216 (9)Public Health Associated with Homeless Encampments on Department Owned Rights of Way, May 2023 (PDF 955KB)5/1/2023
ESSB 5689311Capital projects quarterly report5/15/2023
Quarterly
SSB 5165601 (1) (l)Administrative Transfers5/15/2023
Quarterly
ESSB 5689209 (3) (b)New Tolling Back Office System Report (PDF 519KB)5/16/2023
ESSB 5689707State Commercial Aviation Coordinating Commission Final Report (PDF 616KB)6/15/2023
SSB 5092129 (99)Creates a new Aviation and Aerospace Advisory Committee supported by Dept. of Commerce. Includes WSDOT Secretary or designee as Aviation Director as admin. co-chair. A strategic plan must be developed for the Dept of Commerce's aerospace, aviation, and airport economic development program, with guidance from the Advisory committee.6/30/2023
ESSB 5689219 (3)Vehicle Miles Traveled Targets - Final Report (PDF 1.29MB)6/30/2023
SSB 5975209 (3)I-5 Master Plan - Interim Report (PDF 2.73MB)6/30/2023
SSB 5975209 (4)I-5 Near-Term and Longer-Term HOV Recommendations - Interim Report (PDF 2.35MB)6/30/2023
ESSB 5689219 (9)Performance Based Project Evaluation Model Report (PDF 1MB)6/30/2023
ESSB 5689221 (15) (a)Frequent Transit Service Study Final Report (PDF 628KB)6/30/2023
ESSB 5689222 (19)Mukilteo Multimodal Terminal Solar Power Generation Report6/30/2023
ESSB 5689223 (3)Ultra High-Speed Ground Transportation Report (PDF 775KB)6/30/2023
SSB 5092129 (99)Aviation and Aerospace Advisory Committee Strategic Plan6/30/2023
SSB 5975303 (5)US 2 Westbound Trestle Status Report (PDF 3.58MB)6/30/2023
RCW 81.104.11592022 Rail Fixed Guideway Public Transportation System Safety Report (PDF 6.81MB)6/30/2023
(Annually)
ESSB 5689219 (6)SR302 Victor Area Corridor Study (PDF 27.1MB)6/30/2023
ESSB 5689220 (2) & (3)Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES8/15/2023
Semi-Annually
ESSB 5689311Capital projects quarterly report8/15/23
Quarterly
SSB 5165601 (1) (l)Administrative Transfers8/15/23
Quarterly
SSB 5165209 (2)

209 (5)

 
I-405 Express Toll Lane Project Performance Measure Reports

The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility
11/30/2023

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.