Search projects
Learn about current transportation network improvement and preservation activities throughout the state.
You might be looking for studies or local agency managed projects
367 results
Project
I-5/McAleer Creek Fish Passage
Timeline: Winter 2021 - Spring 2028
Reconnecting waterways where roads act as barriers is a priority for the state. In western Washington, this means building hundreds of fish-passable structures under state highways to create habitat that is essential for meeting fish recovery goals.
Two culverts in the interchange…
Two culverts in the interchange…
Project
I-5/NB 12th Street NE Bridge – Girder Replacement - Complete Winter 2023
Timeline: August 2022-winter 2023
During fall 2022, contractor crews replaced the damaged girder on the 12th Street Bridge over Interstate 5 between Everett and Marysville. In addition to replacing the girder, part of the bridge deck and barrier were rebuilt.
Project
I-5/NB Lowell Rd to Snohomish River - PCCP & Expansion Joints Rehab - Complete October 2023
Timeline: Fall 2022 - Fall 2023
We rehabilitated more than 3 miles of pavement, replacing broken panels and grinding the surface to eliminate ruts worn by decades of vehicles. In addition, we replaced expansion joints on four bridges. This project was combined with another rehabilitation project on I-90 to reduce costs.
Project
I-5/NB North Lake Samish to Nooksack River – Concrete Pavement Rehab
Timeline: 2024 - To be determined
The project is on I-5 from North Lake Samish (south of the city of Bellingham) to the city of Ferndale near the Nooksack River. The Portland Cement Concrete Panels within the project limits are approximately 60 years old and are near or have exceeded their design life. The project will provide…
Project
I-5/Northgate Way & Maple Rd Bridges – Seismic Retrofit - Complete September 2023
Timeline: Summer 2022 – summer 2023
Through summer 2023, our contractor crews strengthened three bridges on Interstate 5 so they can better withstand a major earthquake. They wrapped steel “jackets” around the columns that support the bridges to hold the concrete together in an earthquake, reducing the chance of collapse. They also…
Project
I-5/SB East Edgar St to East Gwinn Place Noise Wall
Timeline: Spring 2024 – Spring 2025
This project built a noise wall along southbound Interstate 5 from East Edgar Street to Franklin Avenue East. Contractor crews working for WSDOT constructed the new noise wall to abate noise from the I-5 express lanes just south of the Ship Canal Bridge between Lake Union and Portage Bay. The wall…
Project
I-5/Seattle - Enhanced Ramp Metering - Complete February 2024
Timeline: Winter 2022 - Winter 2024
We installed new overhead ramp meters at the Swift Avenue South, South Michigan Street/South Bailey Street and Northeast 50th Street on-ramps to northbound Interstate 5 in Seattle. The new ramp meters regulate both the general purpose lanes and the HOV lanes. They replaced existing ramp meters that…
Project
I-5/Secret Creek - Fish Passage
Timeline: February 2025 to December 2026
Washington State Department of Transportation and contractor crews will replace existing fish barriers under I-5 and Old Highway 99 near Stanwood with three new fish-passable arch structures to restore fish passage.
On I-5 and Old Highway 99, crews will replace existing culverts…
On I-5 and Old Highway 99, crews will replace existing culverts…
Project
I-5/Southbound 100th Street Southeast Vicinity to Broadway Avenue – Paving
Timeline: Spring 2025 – Fall 2025
This project will grind and pave about four miles of southbound Interstate 5 in Everett, from 100th Street Southeast to Broadway Avenue. Crews working for WSDOT will pave the mainline. This project will also replace impacted traffic loops, pavement markings and replace bridge joints.
Project
I-5/SR 523 Interchange Improvement
Timeline: 2020 - 2025
People who use the interchange at I-5 and SR 523 (North 145th Street) in Shoreline need safe and efficient ways to move through this area, using all modes of transportation. This will be increasingly important with the arrival of Sound Transit Link light rail and the new Shoreline South/148th…
Project
I-5/Thornton Creek to Lake Washington Fish Passage
Timeline: Summer 2026 - Fall 2029
This project will remove a fish passage barrier along Thornton Creek under Interstate 5 near State Route 523/NE 145th Avenue in Shoreline. Contractor crews working for WSDOT will replace the two existing 2,000-foot-long, 6-foot culverts with three fish-passable structures. The current culverts are…
Project
I-5/Tributaries to Friday, Lake & Chuckanut Creeks - Fish Passage
Timeline: Spring 2025 - Winter 2028
This project removes and replaces several outdated culverts under I-5 roads for the Unnamed Tributaries of Friday Creek, Lake Creek, and Chuckanut Creeks in Whatcom and Skagit Counties.
WSDOT will replace outdated culverts with new structures for improved fish migration in the…
WSDOT will replace outdated culverts with new structures for improved fish migration in the…
Project
I-5/Unnamed Tributary to Penny Creek and Silver Lake Fish Passage
Timeline: Summer 2027 - Winter 2030
This project will remove three barriers to fish passage along two Unnamed Tributaries to Silver Lake and an Unnamed Tributary to Penny Creek under Interstate 5 near 112th Street Southeast in Everett. Contractor crews working for WSDOT will remove existing culverts and replace them with fish-…
Project
I-5/Yesler Way to Northgate Vic - Pavement, Deck, Joints and Drainage
Timeline: 2020 - 2027
In January 2025, WSDOT postponed long-term I-5 lane closures between downtown Seattle and Northgate, to align construction spending with available budget. WSDOT is currently working with its contractor, Atkinson Construction, to identify the best way to complete this necessary preservation work…
Project
I-90 - BNRR Bridge to Geiger Road – Paving
Timeline: July 2025 - August 2025
This project will rehabilitate approximately 5.42 miles of I-90 from BNRR Bridge (MP 267.84) to Geiger Road (MP 273.26) in Spokane County by removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA).
Project
I-90 - Eastgate to SR 900 - Corridor Improvements
Timeline: August 2019 - Spring 2023
This project adds capacity for both directions of I-90 between Eastgate and West Lake Sammamish Parkway interchanges by restriping the roadway and adding an auxiliary lane. Crews also built sound walls in strategic locations to minimize traffic noise.
Project
I-90 - Ritzville to Tokio - Paving - Complete November 2023
Timeline: Spring 2023 - Fall 2023
This project will rehabilitate roughly 13 miles of Interstate 90 from Ritzville to approximately five miles east of Sprague Lake in Adams County. Once the project is completed by grinding and inlaying new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be preserved…
Project
I-90 - Snoqualmie Pass East - Cabin Creek Interchange to West Easton Interchange (Phase 3)
Timeline: Summer 2022 - Fall 2028
Phase 3 is part of a 15-mile corridor improvement project to improve safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity. We are increasing traffic capacity and improving safety by adding a new lane in each direction, replacing concrete pavement, stabilizing…
Project
I-90 - Snoqualmie Pass East - Hyak to Keechelus Dam (Phase 1) - Complete Fall 2019
Timeline: Spring 2009 - Fall 2019
Phase 1 was part of a 15-mile corridor improvement project to improve safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity.
Project
I-90 - Snoqualmie Pass East - Keechelus Dam Vicinity to Stampede Pass Interchange (Phase 2) - Complete Fall 2019
Timeline: Summer 2015 - Fall 2019
Phase 2 was part of a 15-mile corridor improvement project to improve safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity.
Project
I-90 - Snoqualmie Pass East - Stampede Pass Interchange to Cabin Creek Interchange (Phase 4)
Timeline: Summer 2028 - Fall 2031
Phase 4 is part of a 15-mile corridor improvement project to increase safety and reliability and reduce congestion along I-90 from Hyak to the Easton vicinity.
Major Project
I-90 - Snoqualmie Pass East Project
Timeline: 2009 - 2031
The I-90 Snoqualmie Pass East Project improves 15 miles from Hyak to Easton. Phases 1 and 2 from Hyak to the Stampede Pass interchange are complete. Phase 3 is underway.
Project
I-90 - Sunset Creek - Fish Passage
Timeline: 2023 - 2027
WSDOT is building bridges over Sunset Creek along both directions of I-90, Southeast Eastgate Way and Southeast 36th Street in Bellevue. These bridges will replace culverts that block fish passage on Sunset Creek, allowing natural stream conditions to return in this section of the waterway. Bridge…
Project
I-90 Barker to Harvard - Complete October 2023
Timeline: June 2020 - October 2023
Several projects funded through Connecting Washington and partner funds will address the improvement needs on Interstate 90 at the Barker Road interchange, the Harvard Road interchange and local network connections.
Project
I-90 Bridge Deck Preservation – Patching - Complete July 2023
Timeline: August 2022 - July 2023
Multiple bridge decks have fallen below an acceptable rating. This project will rehabilitate the bridge decks by patching potholes and replacing fatigued sections of bridge decks.
Project
I-90 Floating Bridges Anchor Cable Replacement
Timeline: April 2022 - Fall 2022
In Spring 2022, contractor crews working for WSDOT will begin replacing the 38 steel anchor cables on the Lacey V. Murrow and Homer M. Hadley Memorial floating bridge across Interstate 90. Work is expected to be complete this fall.
Project
I-90 Geiger Interchange Improvements - Complete October 2022
Timeline: April 2021 - October 2022
Due to significant growth on the West Plains, three new roundabouts will be constructed at the Geiger/Grove Road interchange with I-90. The reconfigured interchange at Geiger Boulevard and I-90 will provide for more efficient vehicle movement. Improvements include interchange ramp terminal…
Project
I-90 Judkins Park Station – Reconnecting Communities
Timeline: 2023-2027
The I-90/Judkins Park Station—Reconnecting Communities study will identify and recommend changes to the WSDOT I-90 ramps at Rainier Avenue South to improve safe travel for all modes and increase access to the Judkins Park Link light rail station via transit transfer, walking, and biking.
…
…
Project
I-90 Lincoln Co. to BNSF RR Bridge - Roadside Improvements - Complete June 2021
Timeline: April 2021 - June 2021
This project sets out to reduce the risk and severity of run-off-the-road collisions throughout the highway corridor by removing vertical rock cuts and outcrops from the median or by shielding the rock with barrier.
Project
I-90 Mullan Road Overcrossing Bridge Deck Repair - Complete August 2022
Timeline: March 2022 - July 2022
This project will rehabilitate the deteriorating concrete bridge deck for the Mullan Road Bridge over I-90. Crews will remove approximately 1.5 inches of existing concrete through hydro-demolition. Once removed, existing reinforcing steel that is exposed will be evaluated to determine the need and…
Slow down on ice and snow.
It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.
Carry chains, practice installing them.
Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.
Pack your winter car kit.
Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.