Learn about current transportation network improvement and preservation activities throughout the state.
You might be looking for studies or local agency managed projects
367 results
Project
I-90 Soderman Creek/SR 202 Unnamed Tributary to Patterson Creek - Fish Passage
Timeline: Fall 2021 – Fall 2030
Several blocked culverts below Interstate 90 and State Route 202 in east King County are a barrier to fish migration and will be replaced with new, larger culverts beginning in 2025. Contractor crews working for WSDOT will replace three culverts under I-90 in Preston and one culvert under SR 202…
Project
I-90 Spokane Ramp Meters - Complete June 2023
Timeline: June 2018 - Summer 2023
Several new ramp meters have been implemented and activated throughout Spokane at on-ramps to both east and westbound I-90 with more coming. The ramp meters are used to space out vehicles as they enter I-90 to reduce the "platooning" of vehicles as they enter and reduce collisions. The…
Project
I-90 Vantage Bridge – Replace Bridge Deck and Special Repairs
Timeline: Spring 2024 - Spring 2028
This project replaces the existing bridge deck on the I-90 Vantage Bridge to maintain the structural integrity, ensure the safety of the highway and extend the life of the bridge. The Vantage Bridge was built in 1962 and the last time the bridge received a major overhaul was in 1982.
Project
I-90 – Guardrail Basic Safety - Rehabilitation
Timeline: July 2025 - October 2025
This project will remove, replace, and rehabilitate existing guardrail along I-90 from MP 192 in Adams County to MP 272.60 in Spokane County to preserve function, ensure terminals are crashworthy and that the system meets standards.
Project
I-90 – Lewis, W. Village Park, Schneider Creeks – fish passage projects
Timeline: 2020 to 2029
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals. Beginning in 2025, WSDOT will build multiple…
Project
I-90 – Rosamond Bridge Deck Rehabilitation - Complete August 2023
Timeline: June 2023 - November 2023
This project will rehabilitate the concrete deck of the I-90 overcrossing at Rosamond Avenue in Spokane. Crews will repair delaminated and deteriorated areas and apply a protective inlay to provide a sound, smooth surface, prevent further corrosion of the reinforcing steel, and preserve structural…
Project
I-90 – Sprague to SR 904 - Illumination Rebuild - Complete November 2023
Timeline: Spring 2023 - Fall 2024
This project will replace a total of 51 luminaires at six interchanges along I-90 between the city of Sprague in Lincoln County and the SR 904 interchange in Spokane County. The aging illumination system will be replaced with modern components including LED light fixtures which will save on…
Project
I-90 – SR 18 Interchange Improvements
Timeline: 2022 - 2025
Growth in Snoqualmie Valley has made the I-90/SR 18 interchange one of the busiest in the state, causing backups during peak times and busy travel weekends. To improve traffic flow, WSDOT is building a diverging diamond interchange and adding two lanes on SR 18 between the interchange and Deep…
Project
I-90, SR 202, SR 203 & SR 900 – Adaptive Management
Timeline: Summer 2025 - Summer 2026
The project has four locations: Interstate 90 at Issaquah Creek and tributaries, State Route 202 at Little Bear Creek, SR 203 at Thayer Creek, and SR 900 at Green Creek. Each project will enhance fish habitat and allow for fish passage by adding meander bars, modifying stream bed material,…
Project
I-90/104th Street Vicinity Stream Mitigation
Timeline: Spring 2025 - Fall 2025
Crews working for WSDOT will realign the stream and grade the channel for Unnamed Tributary to Lake Creek on Southeast 104th Street just south of the city of Snoqualmie in King County. The stream’s culvert will remain as-is during this project’s stream bed work. This project is required to support…
Project
I-90/142nd Pl SE over I-90 - Bridge repair - Complete April 2023
Timeline: Winter 2023
This work was completed in spring 2023. Contractor crews repaired a steel girder that supports 142nd Place Southeast over Southeast Eastgate Way and I-90. The girder was damaged when it was struck by a truck hauling construction equipment that was too tall.
Project
I-90/EB East Channel Bridge - Modular Assembly Joints
Timeline: Fall 2023 - Summer 2025
The Modular Assembly Joints on the I-90 EB East Channel Bridge are deteriorating and have reached the end of their service life. Replacing the existing expansion joints will preserve the bridge’s structural integrity and extend its service life.
Project
I-90/EB Mercer Slough Bridge - Rehabilitation
Timeline: Spring 2025 - Fall 2026
This project will rehabilitate just under one mile of eastbound Interstate 90 Mercer Slough Bridge from Bellevue Way Southeast to I-405. Crews working for WSDOT will install new bearing seats, modify expansion joints and install new expansion seals. This work will preserve the structural integrity…
Project
I-90/EB Mercer Slough to 150th Ave SE - Paving
Timeline: Spring 2025 - Winter 2025
This project will pave nearly two miles of eastbound Interstate 90 from 118th Avenue Southeast (MP 9.72) to 150th Avenue Southeast (MP 11.55) in Bellevue. Crews working for WSDOT will rehabilitate the existing roadway surface and restore the roadway striping. In addition, on the bridge over…
Project
I-90/Homer Hadley East Approach Bridge - Modular Expansion Joint - Complete September 2022
Timeline: Summer 2022-fall 2022
In September 2022, contractor crews working for WSDOT replaced the original expansion joint on the east end of the westbound I-90 Homer Hadley bridge that connects Mercer Island to Seattle.
Project
I-90/WB E Sunset Way to E Fork Issaquah Crk - PCCP Replace & Deck Overlay - Complete October 2023
Timeline: Summer 2022 - Fall 2023
In 2022, we added drainage and replaced about 1,550 feet of concrete panels on westbound I-90 with asphalt. During 2023 we replaced select concrete panels to smooth a 1-mile section of rough freeway about 1.5 miles west of SE High Point Way. In addition, we completed repairs at two bridges along…
Major Project
Interstate Bridge Replacement Program
Timeline: 2019 - 2035
The Interstate Bridge Replacement program is a bi-state effort with the Washington State Department of Transportation and the Oregon Department of Transportation to replace the aging Interstate Bridge along I-5 over the Columbia River between Portland and Vancouver. The program will build a new,…
Major Project
North Spokane Corridor
Timeline: August 2001 - 2030
The North Spokane Corridor (NSC) is a 10.5-mile multi-modal corridor. When complete, the NSC will be a 60-mile per hour, north/south limited access facility that connects I-90 at the south (just west of the existing Thor/Freya interchange) and connects to US 2 (at Farwell Road) and US 395 (at…
Project
Northwest Region Strategic Concrete Bridge Deck Preservation - Complete Oct. 2024
Timeline: Fall 2021 - Fall 2024
We repaired or replaced the concrete on 17 bridges in King, Snohomish, Skagit and Whatcom counties. Before this project, many of these concrete bridge decks had patches covering old potholes and ruts. Contractor crews removed damaged and patched areas and replaced it with new slabs of concrete.…
Project
Northwest Region/North and South Strategic Pavement Preservation
Timeline: Summer 2025 - Fall 2026
Crews working for WSDOT will perform crack sealing and asphalt patching on numerous routes in King, Snohomish, Skagit, Whatcom and Island counties. The work also includes concrete panel replacement on seven miles of Interstate 5 from just north of the Ship Canal Bridge to just south of Northeast…
Project
NWR Emergency Pavement Repair - Complete Summer 2023
Timeline: July 2022 - June 2023
The Northwest Region Emergency Pavement Repair project covered 88 locations among 23 communities in King, Snohomish, Skagit and Whatcom counties. The repairs spanned three interstates, 12 state highways and about 20 miles of pavement repair, including four bridge decks.
Completed in…
Completed in…
Project
Olympic Region Strategic Bridge Preservation 2022-23 - Complete Summer 2022
Timeline: Spring 2022 - Fall 2023
Crews repaired and replaced damaged driving surfaces of several bridges in Grays Harbor, Mason, Jefferson, and Kitsap Counties.
Major Project
Puget Sound Gateway Program
Timeline: 2015-2030
The Puget Sound Gateway Program combines the SR 509 Completion Project in King County and the SR 167 Completion Project in Pierce County to complete critical missing links in Washington state's highway and freight network. These projects build important new connections to the state's…
Project
Revive I-5: Preserving a vital freeway
Timeline: Now into 2030s
Dozens of preservation projects are planned to revive Interstate 5 in King and Snohomish counties. Washington’s main freeway was built in the 1960s and needs major preservation and renovation work. Over the coming years, Revive I-5 projects will include pavement repair and full replacement,…
Project
SE Burley-Olalla Rd to Sidney Rd Paving - Complete October 2023
Timeline: July 2023 - October 2023
Workers repaired the surface of westbound SR 16. Repairs were also made to three bridge expansion joints.
Project
South Access - Surface Street Connections Project
Timeline: July 2021 - Winter 2023
This project completes final roadway work around the south portal of the SR 99 tunnel and builds new pedestrian and bicycle amenities that connect Seattle’s stadiums with the waterfront.
Project
SR 104 - Hood Canal Bridge - Center Lock Rehabilitation
Timeline: May 2021 - Fall 2025
Crews will upgrade and replace key elements of the SR 104 Hood Canal Bridge. The construction bolsters systems that guide the bridge together and keep both halves of the bridge connected.
Project
SR 104 - Lyon Creek Fish Passage
Timeline: Spring 2025 - Spring 2026
This project will remove a fish passage barrier on State Route 104 at Lyon Creek just west of 35th Avenue Northeast in Lake Forest Park. Contractor crews working for WSDOT will upgrade an existing 6-foot by 4-foot box culvert with a 24-foot structure. This new structure has the potential to open…
Project
SR 104 - Paradise Bay - Shine Road & SR 19 - Intersection Safety Improvements
Timeline: May 2024 - Summer 2025
This project improves safety along State Route 104 in Jefferson County at Shine Road/Paradise Bay Road and at State Route 19. At SR 19, a single-lane roundabout has been built. At Shine Road/Paradise Bay Road, a single-lane metered roundabout will be built. The meter will be active only after a…
Project
SR 104 - SR 19 - Intersection Safety Improvements
Timeline: Late Spring 2024 - Early Winter 2024
To improve safety and reduce head-on collisions, crews will construct a single-lane roundabout at State Route 104 and SR 19 (Beaver Valley Road).
Roundabouts are a proven solution to reduce the frequency and severity of collisions while maintaining a consistent flow of traffic.…
Roundabouts are a proven solution to reduce the frequency and severity of collisions while maintaining a consistent flow of traffic.…
Slow down on ice and snow.
It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.
Carry chains, practice installing them.
Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.
Pack your winter car kit.
Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.